100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

NPDES COMPREHENSIVE EXAM UPDATED QUESTIONS AND ANSWERS GUARANTEE A+

Rating
-
Sold
-
Pages
8
Grade
A+
Uploaded on
07-01-2026
Written in
2025/2026

NPDES COMPREHENSIVE EXAM UPDATED QUESTIONS AND ANSWERS GUARANTEE A+

Institution
NPDES
Course
NPDES









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NPDES
Course
NPDES

Document information

Uploaded on
January 7, 2026
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NPDES COMPREHENSIVE EXAM UPDATED QUESTIONS
AND ANSWERS GUARANTEE A+
✔✔What kind of water quality does a rim ditch system produce? - ✔✔The poorest water
quality with highest turbidity NTU levels.

✔✔What must a well-point and horizontal pump system have in order to function
properly? - ✔✔Primarily sandy soil.

✔✔What methods are used to manage (treat) nonstormwater discharges & remove
sediment from construction pumping? - ✔✔Sediment traps & basins, weir & dewatering
tanks, and chemical treatment.

✔✔FDEP General Permit for Dewatering requires that you be how many feet from a
"known contamination source?" - ✔✔500 feet or greater

✔✔What tools can be used by the permit applicant to determine the cleanup and
restoration status of a known contamination site? - ✔✔The Contamination Locator Map
(CLM) and the Institutional Controls Registry Web Viewer.

✔✔What must the permittee do if the discharge from their dewatering notices the
presence of a pollutant or pollutants such as a sheen, or odor? - ✔✔Cease operations
immediately, contact their DEP District Ground Water Section for guidance, and contact
the 24 Hour Reporting - State Warning Point.

✔✔When using chemical treatment systems, what should you remember? - ✔✔"The
right chemical at the right dosage."

✔✔What two are the most common and approved flocculant chemicals utilized to
control turbidity on a job site to reduce turbidity? - ✔✔Anionic Polyacrylamide (PAM)
and Aluminum Sulfate (Alum).

✔✔Before discharging chemically treated water, what should you test for? - ✔✔pH and
turbidity limits.

✔✔The US EPA authorized Florida to implement the NPDES in what year: 1972/ 1999/
2000/ or 2007? - ✔✔2000

✔✔The NPDES Generic Permit for Florida in the phase II implemented was effective on
this year: 1979/2001/2005/2015? - ✔✔2015

✔✔A Large Construction activity results in disturbing ____ acres or more total land
area. - ✔✔five

, ✔✔What is a construction activity? Building a LEGO city/ clearing pine trees and
burning them/ building a garden shed behind your house/ and replacing windows and
doors in your home? - ✔✔Clearing pine trees and burning them

✔✔A road is a type of linear project? True or False - ✔✔True

✔✔Obtaining permit coverage is the responsibility of the: engineering firm/FDOT/
subcontractor/ the Operator. - ✔✔Operator

✔✔The person, firm, contractor, public organization, or other legal entity responsible for
construction is known as the: boss/ operator/ serve party/ improvement board? -
✔✔Operator

✔✔What should be the Operator's first step? Submit the NOI/ develop the perimeter
fencing around the area to be disturbed/ develop the SWPPP? - ✔✔Develop the
SWPPP

✔✔You can now complete and submit the NOI application and fee electronically? True
or False. - ✔✔True

✔✔After getting the NOI and the acknowledgement letter you can start clearing land?
True or False - Must wait 48 hours - ✔✔False

✔✔What do you do with the NOI once you receive it? You can file it/ send a copy to the
inspector/ put it in the garbage can DEP has a copy/post on the job board. - ✔✔Post on
the job board.

✔✔The CGP permit will allow you to do the following: Fill a wetland area/ dump
construction debris/ cause a water quality violation / perform construction activity. -
✔✔Perform construction activity

✔✔The Qualified Inspector is anyone who has: Read the CGP/ writes a SWPPP/ paid
the fee for the permit/ passed the FSESCI class. - ✔✔passed the FSESCI class

✔✔The SWPPP can exceed the requirements under Part IV of the CGP? True or False
- ✔✔True

✔✔Once your site has achieved final stabilization of 70% or greater you have how
many calendar days to submit an NOT? 7, 10, 14, 21 - ✔✔14

✔✔You can you transfer your NOI to a new contractor. True or False - ✔✔Flase

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BOARDWALK Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
185
Member since
1 year
Number of followers
7
Documents
25069
Last sold
10 hours ago
BOARDWALK ACADEMY

Ace Your Exams With Top Quality study Notes And Paper✅✅ ALL ACADEMIC MATERIALS AVAILABLE WITH US✅✅ LEAVE A REVIEW SO THAT WE CAN LOOK AND IMPROVE OUR MATERIALS.✅✅ WE ARE ALWAYS ONLINE AND AVAILABLE DONT HESITATE TO CONTACT US FOR SYUDY GUIDES!!✅✅ EVERYTHING IS GRADED A+✅✅ COLOUR YOUR GRADES WITH US , WE ARE HERE TO HELP YOU DONT BE RELACTANT TO REACH US

3.7

33 reviews

5
14
4
6
3
7
2
0
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions