Installers of a category 1 Medical gas pipe distribution system must be qualified in
accordance with ASSE 6010. What is certification requirement for installers of Category
3 Medical gas pipe distribution system?
6010
When is the initial pressure test conducted by the installer?
After blowdown of the distribution piping
In those portions of systems intended to handle oxygen pressures greater than 350 PSI, the
interconnecting hose shall not contain ____
materials.
Polymeric
Final line filters for instrument air shall be rated for a minimum of ____ efficiency at ____
micron?
98% at .01
Instrument air systems shall activate the alarm systems when the dewpoint at system
pressure exceeds ____?
Negative 22° Fahrenheit
,Medical air purity for compressor systems shall be analyzed prior to the source out of being
opened. Samples taken at the system sample port for carbon monoxide shall not exceed
____?
10 PPM
ASSE 60 10?
Installers
ASSE 60 20?
Inspectors
ASSE 60 30?
Verifiers
ASSE 60 40?
Maintenance personnel
The installation of medical gas and vacuum system including brazing shall be made by
experience qualified and cabinet installers. Installer shall be certified to the requirements
which codes/standards.
ASME Section IX & ASSE Standard 60 10
, The main line valve shall be located on which side of the source valve, when the main line
valve enters the building?
Facility side of the source valve
The quality of instrument air shall be dry to a dewpoint of ____?
Negative 40°F
What percent of the zones shall be tested at the outlet most remote from the source to
verify the piping particulate test?
25%
Where instrument air systems are provided with a standby header, the header shall have
how many cylinders attached?
One-hour of normal operation
A continuous tape or marker should I be placed immediately above the buried pipeline
enclosure, and shall be identified by ____?
Specific name
ACCURATE SOLUTIONS
Installers of a category 1 Medical gas pipe distribution system must be qualified in
accordance with ASSE 6010. What is certification requirement for installers of Category
3 Medical gas pipe distribution system?
6010
When is the initial pressure test conducted by the installer?
After blowdown of the distribution piping
In those portions of systems intended to handle oxygen pressures greater than 350 PSI, the
interconnecting hose shall not contain ____
materials.
Polymeric
Final line filters for instrument air shall be rated for a minimum of ____ efficiency at ____
micron?
98% at .01
Instrument air systems shall activate the alarm systems when the dewpoint at system
pressure exceeds ____?
Negative 22° Fahrenheit
,Medical air purity for compressor systems shall be analyzed prior to the source out of being
opened. Samples taken at the system sample port for carbon monoxide shall not exceed
____?
10 PPM
ASSE 60 10?
Installers
ASSE 60 20?
Inspectors
ASSE 60 30?
Verifiers
ASSE 60 40?
Maintenance personnel
The installation of medical gas and vacuum system including brazing shall be made by
experience qualified and cabinet installers. Installer shall be certified to the requirements
which codes/standards.
ASME Section IX & ASSE Standard 60 10
, The main line valve shall be located on which side of the source valve, when the main line
valve enters the building?
Facility side of the source valve
The quality of instrument air shall be dry to a dewpoint of ____?
Negative 40°F
What percent of the zones shall be tested at the outlet most remote from the source to
verify the piping particulate test?
25%
Where instrument air systems are provided with a standby header, the header shall have
how many cylinders attached?
One-hour of normal operation
A continuous tape or marker should I be placed immediately above the buried pipeline
enclosure, and shall be identified by ____?
Specific name