In a crawl space how far from the floor joints do you need to place vapor
retarder
Answer- Top Soil
What is the maximum lateral distance to egress when working in a
trench? 10 - 15 - 25
Answer- 25
What type of latex coating will not chalk when applied to exterior walls
Answer- Latex
Employee brought his own tools to work, who's responsible for the tools
safety Employer or the employee
Answer- employer
,What is the maximum thickness of bed joint?
Answer- 3.8 joint
What is first step in finishing concrete
Answer- screening
Ice dam protection needs to be _________ from the edge of eaves
Answer- 24 inch
Prior to the installation of wood floor how long for acclimation
Answer- 4-5 days
Where to install radiant heat barrier in attic
Answer- Rafters
High wind area how many fasteners per shingle
Answer- 6 fasteners
, what kind of siding can be vertically installed?
Answer- Panel Bearden
space ties on concrete walls distance between ties
answer- 24 inch
When building a block foundation where does one start
Answer- Corners
What is the maximum area for a window glazing panel in a 1 hr. fire
rated door installation on interior wall?
Answer- 100 sq.
A door frame consists of what parts
Answer- one head, two side job
What material is acceptable for valley on asphalt shingle roof
installation