100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

SWM DEQ Exam Questions and Answers 100% PASS

Rating
-
Sold
-
Pages
15
Grade
A+
Uploaded on
05-01-2026
Written in
2025/2026

SWM DEQ Exam Questions and Answers 100% PASS

Institution
VA Deq Swm Inspector
Course
VA deq swm inspector









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
VA deq swm inspector
Course
VA deq swm inspector

Document information

Uploaded on
January 5, 2026
Number of pages
15
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

SWM DEQ Exam Questions and
Answers 100% PASS

The Virginia Stormwater Management Program is authorized by the ______ and

administered through the ______ - CORRECT ANSWER-Virginia Stormwater

Management Act, Virginia Stormwater Management Program Regulation

VPDES Permit/Construction GP authorizes discharge of stormwater from

construction activities that are - CORRECT ANSWER-greater than or equal to an

acre

The Stormwater Management Act requires the State Water Control Board to -

CORRECT ANSWER-permit, regulate, and control stormwater runoff

DEQ has ___ days to complete review of real or potential inter-jurisdictional

impacts upon request - CORRECT ANSWER-90

The Stormwater Management Act requires the following individuals to obtain and

maintain a certificate of competency - CORRECT ANSWER-staff of a stormwater

program, anyone contracted by a VSMP authority, standard and specification

holders

, The dual certificate will expire three years from - CORRECT ANSWER-the latest

date of the certificates

SWM plan must be approved by ___ before land disturbance - CORRECT

ANSWER-VSMP program authority

The water quality criteria sets a site-based load limit of ____ of total phosphorus

for new development - CORRECT ANSWER-0.41 lbs/acre/year

The phosphorus load limit uses the - CORRECT ANSWER-10% impervious

cover

Part II B and II C water quantity criteria addresses - CORRECT ANSWER-

channel protection and flood protection

Which two plans in the SWPPP must be approved? - CORRECT ANSWER-SWM

plan, ESC plan

Does the SWM plan address runoff during or after construction? - CORRECT

ANSWER-post-construction

What is the lower limit of the range of imperviousness that can result in stream

degradation? - CORRECT ANSWER-10%

What do land disturbing activities consist of? - CORRECT ANSWER-excavating,

clearing, grading




COPYRIGHT ©️ 2025 ALL RIGHTS RESERVED

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
KatelynWhitman West Virginia University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1107
Member since
2 year
Number of followers
482
Documents
34225
Last sold
12 hours ago
Golden Quill Emporium Store

Get Yourself Well-Researched Study Materials to Ace Your Online& Actual Exam Tests with Confidence. STUDY LIKE A PRO WITH A WELL FORMATTED Q&A MATERIALS.

3.6

243 reviews

5
98
4
39
3
54
2
20
1
32

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions