QUESTIONS AND ANSWERS 2026
PNT B2 - ANSWERSPaint baseboard +two coats PF or LF
FCC LAY - ANSWERSFloor coveing carpet/lay exisiting carpet. Always F
PNT P2 - ANSWERSPaint parts of the walls two coats. .25w/.50w/WC/C
APP wash/dry - ANSWERSWSH +RS /DRY+RS
DMO definition and options. - ANSWERSPU-pick up truckload. DUMP-dumpster with -
for smaller load.
CON LAB - ANSWERSContent manipulation charge per hour
CON PROT - ANSWERS+Protect contents/cover with plastic.
DRY LF - ANSWERSDrywall per LF up to 2ft tall
DRY LF> - ANSWERSUp to 4ft
FCC PAD - ANSWERSCarpet PAD square footage of carpet in room.
CLN FCC - ANSWERSClean floor covering carpet and deodorize.
DRY 5/8 - ANSWERSHung, taped, ready for texture +amount of square feet.
DRY TEX - ANSWERSTexture drywall light hand texture +square feet.
PNT MASKLF - ANSWERSMask and prep for paint. Plastic, paper, tape Per LF. Always
PC ceiling.