100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Building Automation Lesson 2 Electrical System

Rating
-
Sold
-
Pages
4
Grade
A+
Uploaded on
02-01-2026
Written in
2025/2026

A hydroelectric-generating plant uses ? to generate electricity? water flow water pressure 2. Which type of power source is typically located on or near customer facilities, requires little distribution infrastructure, and supplies power in the event of an interruption in power from the electric utility? Secondary 3. Which of the f

Show more Read less
Institution
Building Automation Lesson 2 Electrical System
Course
Building Automation Lesson 2 Electrical System








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Building Automation Lesson 2 Electrical System
Course
Building Automation Lesson 2 Electrical System

Document information

Uploaded on
January 2, 2026
Number of pages
4
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Building Automation Lesson 2 Electrical System
Study online at https://quizlet.com/_bwhihe

1. A hydroelectric-generating plant uses ? to generate water flow
electricity? water pressure

2. Which type of power source is typically located on Secondary
or near customer facilities, requires little distribution
infrastructure, and supplies power in the event of an
interruption in power from the electric utility?

3. Which of the following electrical loads are required by Egress lighting
governing entities to have secondary power sources? Fire pumps

4. What percentage of electricity is produced from nu- 19%
clear power?

5. ? are the most commonly used source of secondary Engine generators
power.

6. Net metering uses one meter that can measure power T
usage in either direction (importing or exporting), ef-
fectively subtracting exported electricity from import-
ed electricity. This determines the net electricity con-
sumption of the utility customer.

7. What is the last point on the power distribution system The switchboard
for the power company?

8. The terms "step-up transformer" and "step-down voltage
transformer" describe an increase or decrease in ? .

9. An overcurrent protective device prevents ? from conductors or devices
reaching excessively high temperatures, due to high
currents, by opening the circuit.

10. Electrical demand
1/4

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
learndirect Liberty University
View profile
Follow You need to be logged in order to follow users or courses
Sold
45
Member since
1 year
Number of followers
10
Documents
3339
Last sold
1 month ago
Learndirect

Here You will All Documents, and Package Deal Offered By Seller Learndirect.

3.3

6 reviews

5
3
4
0
3
1
2
0
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions