2026 PMP Cheat Sheet with all Correct & 100% Verified Answers |Guaranteed to Pass

Institution
PMP
Course
PMP









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PMP
Course
PMP

Document information

Uploaded on
December 22, 2025
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

2026 PMP Cheat Sheet with all Correct & 100% Verified
Answers |Guaranteed to Pass

The sequence in finding the root cause of the problem when selecting an answer. ✔Correct
Answer-Assess/analyze; review; take action
(Assess/analyze to ID the root cause, then review the pm plan and documents, then take action.)

______ might happen, while _________ are occurring/ have occurred. ✔Correct Answer-risks,
issues

You add risks to the _________, not the _________. ✔Correct Answer-risk register, risk
management plan

What document should you review when there are team issues? ✔Correct Answer-team charter

In ______ the PM assigns work and in _____ team self assigns. ✔Correct Answer-predictive, agile

The _______ helps the _______ sort out product backlog. ✔Correct Answer-scrum master, product
owner

In __________ customer feedback is throughout the project. ✔Correct Answer-agile

To resolve resource conflicts work with the ____________________. ✔Correct Answer-functional
manager

For overall guidance refer to the ______________, for high-level refer to the ___________.
✔Correct Answer-project management plan, project charter

The best option for a demo; helpful when most requirements are already known ✔Correct Answer-
prototype

What should a new PM assigned to an existing project do? ✔Correct Answer-Continue to monitor
before taking any action.

As a new PM to a project is the first thing you should review is ... ✔Correct Answer-Project charter

___________ life cycle provides finished deliverables a customer can use immediately ; __________
allows feedback for unfinished work; __________ is both iterative and incremental. ✔Correct
Answer-incremental, iterative, agile

Start and finish dates adjusted based on resource constraints; tasks can be delayed ✔Correct
Answer-Resource leveling

Used when there's an uneven allocation of resources, after resource leveling, when you have to
optimize the resources and CANNOT extend schedule ✔Correct Answer-resource smoothing

What is the most accurate form of estimating? ✔Correct Answer-bottom-up

, The most accurate estimating, consists of agreggating estimates of lower-level components of WBS.
Is very time consuming. ✔Correct Answer-bottom-up

What is the least accurate form of estimating? ✔Correct Answer-anologous (top-down)

Less accurate estimating, uses historical data. ✔Correct Answer-anologous (top-down)

A form of estimating where that is algorithm based on deriving a number. ✔Correct Answer-
Parametric estimating

Best form of estimating for when there is insufficient historical. data ; commonly uses triangular or
PERT; 3 estimates to define an approx range (most likely, optimistic, pessimistic). ✔Correct Answer-
3 point estimating

If this is a new project, no experience, with not much reliable data, which form of estimating should
you use? ✔Correct Answer-triangular

If the team is made of experts, and you need an accurate estimate, which form of estimating should
you use? ✔Correct Answer-PERT/beta

Performing activities in parallel, may not result in increased cost but may increase risk ✔Correct
Answer-Fast tracking

Additional resources are used to shorten schedule, always increases cost, may increase risk
✔Correct Answer-Crashing

Cost baseline ___________ contingency reserve, _________ management reserves ✔Correct
Answer-includes, excludes

Cost baseline plus management reserves ✔Correct Answer-Project budget

Contingency reserves are for ___________ risks ✔Correct Answer-identified

Management reserves are for __________ risks ✔Correct Answer-unidentified

For CPI and SPI _____ than 1 is good. and ______ than 1 is bad. ✔Correct Answer-more, less

What does it mean if the SPI is less than 1? ✔Correct Answer-behind schedule

What does it mean if the CPI is less than 1? ✔Correct Answer-over budget

Formula for CPI? ✔Correct Answer-EV/AC

Diagram used for root cause analysis ✔Correct Answer-Ishikawa diagram/fishbone diagram

Laid back, hands off management style ✔Correct Answer-Laissez faire

Management style. Serves the team and project goals ✔Correct Answer-Servant leader

Management style. High energy, enthusiasm, strong belief and self confidence ✔Correct Answer-
Charismatic

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Studyclub Yale School Of Medicine
View profile
Follow You need to be logged in order to follow users or courses
Sold
20
Member since
11 months
Number of followers
0
Documents
8333
Last sold
5 days ago
"The Club for Top Academic Performance."

Welcome to StudyClub—the ultimate destination for students who want to make studying not only effective but also enjoyable! Whether you’re preparing for an exam, looking to improve your grades, or mastering new subjects, StudyClub is your go-to space to find the tools and resources you need to succeed. At StudyClub, I believe in the power of community. That’s why I’ve created a collection of high-quality study materials designed to simplify complex concepts and help you achieve your academic goals. Whether you’re an individual looking to study independently or a student seeking the support of a virtual study group, you’ll find everything you need to succeed. Join the StudyClub today, where learning is made easier, more organized, and—most importantly—more collaborative. Let’s grow together, learn smarter, and unlock your academic potential. Thank you for being part of the StudyClub community. I can’t wait to see you succeed!

Read more Read less
3.0

5 reviews

5
2
4
0
3
1
2
0
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions