C/50 - Test 5
### When using a crane to lift a 12,000- d.# The lifting lines should be as vertical as possible.
gallon tank out of an excavation, what is
the preferable position of the rigging
lines attached to the tanks lifting eyes?
a.# One lifting line should be horizontal.
b.# The lifting lines should be as far
apart as possible.
c.# The lifting lines should be as
horizontal as possible.
d.# The lifting lines should be as vertical
as possible.
, C/50 - Test 5
### Which of the following defines a.# material that contains more than 1.000% asbestos.
surface ACM?
a.# material that contains more than
1.000% asbestos.
b.# material that contains more than
0.100% asbestos.
c.# material that contains more than
0.010% asbestos.
d.# material that contains more than
0.001% asbestos.
, C/50 - Test 5
### When must a contractor provide b.# when airborne exposure exceeds the TWA and excursion limits.
and require the use of protective
clothing?
a.# when class-II work requires removal
of ACM exceeding 10 square feet.
b.# when airborne exposure exceeds
the TWA and excursion limits.
c.# when class-II work requires removal
of TSI exceeding 25 linear feet.
d.# when a negative exposure
assessment is produced.
### Which of the following hazards is of d.# undue absorption of heat
the greatest concern when storing gas
cylinders?
a.# vibration
b.# electromagnetic static
c.# prolonged freezing weather
d.# undue absorption of heat
, C/50 - Test 5
### When using a cut-off saw to cut a.# gloves and face shield
steel beams which of the following
should be worn?
a.# gloves and face shield
b.# a face shield and a leather apron
c.# gloves and a welding helmet
d.# a leather apron and gloves
### in the interest of safety what should c.# provide a ladder, ramp, or temporary stairs.
be done when there is a break or
change of elevation of 18 inches or more
in a hallway floor?
a.# postpone work until the permanent
stairway is completed.
b.# post a warning sign at least 8" x 10" in
size.
c.# provide a ladder, ramp, or temporary
stairs.
d.# provide cautionary tape barriers.
### When using a crane to lift a 12,000- d.# The lifting lines should be as vertical as possible.
gallon tank out of an excavation, what is
the preferable position of the rigging
lines attached to the tanks lifting eyes?
a.# One lifting line should be horizontal.
b.# The lifting lines should be as far
apart as possible.
c.# The lifting lines should be as
horizontal as possible.
d.# The lifting lines should be as vertical
as possible.
, C/50 - Test 5
### Which of the following defines a.# material that contains more than 1.000% asbestos.
surface ACM?
a.# material that contains more than
1.000% asbestos.
b.# material that contains more than
0.100% asbestos.
c.# material that contains more than
0.010% asbestos.
d.# material that contains more than
0.001% asbestos.
, C/50 - Test 5
### When must a contractor provide b.# when airborne exposure exceeds the TWA and excursion limits.
and require the use of protective
clothing?
a.# when class-II work requires removal
of ACM exceeding 10 square feet.
b.# when airborne exposure exceeds
the TWA and excursion limits.
c.# when class-II work requires removal
of TSI exceeding 25 linear feet.
d.# when a negative exposure
assessment is produced.
### Which of the following hazards is of d.# undue absorption of heat
the greatest concern when storing gas
cylinders?
a.# vibration
b.# electromagnetic static
c.# prolonged freezing weather
d.# undue absorption of heat
, C/50 - Test 5
### When using a cut-off saw to cut a.# gloves and face shield
steel beams which of the following
should be worn?
a.# gloves and face shield
b.# a face shield and a leather apron
c.# gloves and a welding helmet
d.# a leather apron and gloves
### in the interest of safety what should c.# provide a ladder, ramp, or temporary stairs.
be done when there is a break or
change of elevation of 18 inches or more
in a hallway floor?
a.# postpone work until the permanent
stairway is completed.
b.# post a warning sign at least 8" x 10" in
size.
c.# provide a ladder, ramp, or temporary
stairs.
d.# provide cautionary tape barriers.