100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

VA DEQ ESC INSPECTOR EXAM QUESTIONS AND ANSWERS GRADED A+ 2025/2026

Rating
-
Sold
-
Pages
33
Grade
A+
Uploaded on
17-12-2025
Written in
2025/2026

VA DEQ ESC INSPECTOR EXAM QUESTIONS AND ANSWERS GRADED A+ 2025/2026

Institution
VA DEQ ESC INSPECTOR
Course
VA DEQ ESC INSPECTOR











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
VA DEQ ESC INSPECTOR
Course
VA DEQ ESC INSPECTOR

Document information

Uploaded on
December 17, 2025
Number of pages
33
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

VA DEQ ESC INSPECTOR EXAM
QUESTIONS AND ANSWERS GRADED A+
2025/2026




VESCP - ANS Virginia Erosion and Sediment Control Program



- Administered by counties/cities (must), towns (may)

- MUST BE APPROVED



Minimum Standard 1 - ANS Stabilization



permanent or temporary soil stabilization shall be applied to denuded areas within seven days
after final grade is reached on any portion of the site; temporary soil stabilization shall be
applied within seven days to denuded areas that may not be at final grade but will remain
dormant for longer than 14 days; permanent stabilization shall be applied to areas that are to
be left dormant for more than one year



Site NOT at Final Grade - ANS - stabilize in 14 days

- temporarily seed

- mulch

- permanently stabilize if dormant > 1 year



1 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.

,Site at Final Grade - ANS - stabilize in 7 days (recommended immediately)

- permanently or temporarily seed and mulch

- mulch/matting/straw



Minimum Standard 2 - ANS Stock Piles, Waste and Borrow Areas



during construction, soil stock piles and borrow areas shall be stabilized or protected with
sediment trapping measures



mulch prevents erosion by protecting the surface from raindrop impact and silt fence intercepts
and detains from disturbed areas



Minimum Standard 3 - ANS Permanent Vegetation



permanent vegetation cover shall be established on denuded areas not otherwise permanently
stabilized (permanent vegetation shall not be considered established until a ground cover is
achieved that is uniform, mature enough to survive, and will inhibit erosion *there is no %
associated with this*)



reduce erosion and decrease sediment yield from disturbed area



this is the standard used to verify that a site is ready for release of bonds or surety



Minimum Standard 4 - ANS First-Step Measures



Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to
trap sediment shall be constructed as a first step in any land-disturbing activity and shall be
made functional before upslope land disturbance takes place

2 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.

,a certain amount of initial land disturbance may be required to provide access for equipment to
install the perimeter controls, but site clearing and grading should be kept to a minimum until
the perimeter controls are in place



intercepts and detains small amounts of sediment from disturbed areas during construction
operation to prevent sediment from leaving the site and decrease velocity of sheet flows and
low-to-moderate level channel flow



Perimeter Controls - ANS assures that sediment does not leave the perimeter of the land-
disturbing area once site clearing, grading, and construction commences



Examples: silt fences, sediment traps, sediment basins, construction entrance, temporary
diversions, diversions



Minimum Standard 5 - ANS Earthen Structure Stabilization



stabilization measures shall be applied to earthen structures such as dams, dikes, and diversions
immediately after installation



reduce erosion and sedimentation and reduce damage from sediment and runoff to
downstream or off-site areas



Minimum Standard 6 - ANS Traps and Basins



sediment traps and basins shall be designed and constructed based upon the total drainage
area (not just disturbed area) to be served by the trap or basin




3 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.

, Sediment Traps - ANS minimum storage capacity shall be 134 cubic yards per acre of drainage
area and shall only control drainage areas less than 3 acres



*stone outlet = trap*



Sediment Basins - ANS surface runoff from disturbed areas that is comprised of flow from
drainage areas greater than or equal to 3 acres shall be controlled by a basin; minimum storage
capacity of a sediment basin shall be 134 cubic yards per acre of drainage area; the outfall
system shall, at a minimum, maintain the structural integrity of the basin during a 25-year storm
of 24-hour duration; runoff coefficients used in runoff calculations shall correspond to a bare
earth condition or those conditions expected to exist while the sediment basin is utilized.



Sediment Trapping Devises - ANS 1. place near the lowest drainage points of a project



2. install as a first-step measure [MS-4]



3. stabilize immediately [MS-5]



4. must include outlet protection for basins [MS-11]



Minimum Standard 7 - ANS Cut and Fill Slopes



roughening the surface of the slope decreases runoff, lowers the velocity runoff, increases water
retention, and leads to better seed germination



slopes that are found to be eroding excessively within on year of permanent stabilization shall
be provided with additional slop stabilizing measures until the problem is corrected




4 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brightstars Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
193
Member since
1 year
Number of followers
7
Documents
12191
Last sold
1 week ago
VERIFIED EXAMS AND STUDY GUIDES.

Here, you will find Study Notes, Exam answer packs 100% Guarenteed success.

3.3

31 reviews

5
10
4
4
3
8
2
3
1
6

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions