100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

GENERAL ENGINEERING ECCC LATEST QUESTIONS AND ACCURATE ANSWERS FOR GUARANTEED RESULTS

Rating
-
Sold
-
Pages
6
Uploaded on
14-12-2025
Written in
2025/2026

GENERAL ENGINEERING ECCC LATEST QUESTIONS AND ACCURATE ANSWERS FOR GUARANTEED RESULTS....

Institution
GENERAL ENGINEERING ECCC
Course
GENERAL ENGINEERING ECCC









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
GENERAL ENGINEERING ECCC
Course
GENERAL ENGINEERING ECCC

Document information

Uploaded on
December 14, 2025
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Unknown

Subjects

Content preview

GENERAL ENGINEERING ECCC LATEST QUESTIONS AND
ACCURATE ANSWERS FOR GUARANTEED RESULTS




1. What are the three force protection construction standards? ANSWER a.
Initial, organic, transient

1. What are the three threat levels for force protection? - REPLY a. Level I
(terrorists, agents, and civil unrest) Level III (big conventional force), Level II
(small tactical units, guerillas)


1. What are the force protection efforts' top priorities? - ANSWER a. Create
standoffs and perimeters; create access control points (ACPs and ECPs);
improve security for employees

1. Is it true or false that one of the five types of reconnaissance is engineer
reconnaissance? The response a. Untrue: The term "engineer recon" describes
specialized abilities that can be used to any type of tactical reconnaissance.

Sort the four USACE contingency response components by size. Recon Team,
ADVON, Contingency Engineer District, ANSWER FEST-A

How long should a basecamp constructed according to organic, initial,
temporary, and semi-permanent standards last? ANSWER a. Organic: fewer
than 90 days First: six months or less Temporary: no more than five years
Semipermanent: two to ten years

Which four guiding concepts apply to basecamp planning? The response
Survivability, Sustainability, Standardization, and Scalability

What phases are involved in the planning process for basecamp development?
The response Preliminary planning, location selection, land use planning,
development of facility requirements, general site planning, design guide
phasing and construction, maintenance and upgrades, Cleaning, Closing, and
Archiving

, What steps make up the phasing model for construction projects? Subphases of
the design guide, programming, and construction step of the BCDPP comprise
the ANSWER Construction Project Phasing Model. Project execution and
monitoring, final project transfer and closeout, final planning and project
turnover, initial project planning, preliminary construction planning, and
comprehensive project planning.

In comparison to the master planning processes, when would you use the
BCDPP? ANSWER The base camp development planning process (BCDPP) is
used for in-theater building, whereas master planning phases are utilized for
bases located on US soil.

Which ingredients make up concrete? The response Air, admixtures, aggregate,
Portland cement, and water

True or false: Rebar is added to concrete to strengthen it under compression.
The response Untrue; rebar strengthens concrete under stress and makes it
stronger under compression.

____________ is the name of the chemical reaction that occurs when Portland
cement and water combine. ANSWER Hydration

Which two kinds of reinforcing are used in concrete? The response Rebar, or
structural steel, is used to strengthen concrete against the forces of both static
and dynamic loads. The purpose of temperature and shrinkage steel (wire mesh)
is to keep the concrete from cracking on the surface while it cures and
withstands temperature variations.

For every 50-pound bag of cement, ___ gallons of water should be added.
ANSWER: 8 gallons

When water is added, which of the following properties of concrete increases?
Workability, water tightness, strength, or durability—ANSWER Workability.
The addition of water causes all the others to drop.

You are constructing a concrete pad from a dirt road that will be used by large
cars. To what extent should the margin be thickened? What ratio do you use for
a thicker pad's taper length? The response Use a 1:10 taper and thicken the edge
by 50% (for example, if the slab is 8" thick, thicken it by 4" to make the taper
40" long).

Which three elements make up the project? The response Scope, Money, and

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
luzlinkuz Chamberlain University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1426
Member since
4 year
Number of followers
849
Documents
27616
Last sold
14 hours ago

3.7

303 reviews

5
131
4
61
3
54
2
17
1
40

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions