ECCC GE EXAM COMPLETE QUESTIONS AND 100%
VERIFIED ANSWERS
Response Options for USACE: ANSWER Reconnaissance Team (RT) or
Forward Engineer Support Team-Advance (FEST-A) Advanced Echelon
(ADVON) team Contingency Engineer District (CED)
Tasks for Reconnaissance: ANSWER **General Engineers: Technical
Reconnaissance
Infrastructure Survey, Environmental Evaluation, Airfield Evaluation, Route
Categorization, and Tactical Reconnaissance (**Combat Engineers)
Bridge Observation
Obstacle and Route Reconnaissance
Classification vs. Reconnaissance: General Engineers perform classification.
Combat Engineers conduct reconnaissance.
SWEAT-MSO-ANSWER Academics Trash Medical Safety Other
Considerations Sewage Water Electricity
Construction Planning and MDMP: ANSWER Construction planning and EN
standards for sustainability are where MDMP nests.
Project Origin/Routing: Respond to Unit inquiries on a DA4283
See DPW for authorization.
Make a list of requests for troop construction.
S3 and DPW sync for the project
After projects are selected, a project packet containing the site plan, drawings,
and scope of work is sent.
Construct Activities, BOM, and construction directives are produced by S3C.
The project was given to the executing business.
Definable Features of Work: During the estimating and scheduling phase, the
ANSWER project supervisor determines the features of the work. "Task which
is sperate and distinct from other tasks, has separate control requirements, and
, may be identified by different trades or disciplines, or it may be work by the
same trade in a different environment"
For every specified aspect of the work: ANSWER Apply network analysis,
scheduling, and estimation throughout the preparatory phase.
First Stage: Selecting equipment, materials, and configuration
Phase of Follow-Up: following established protocols
Phase of Completion: (in doctrine: rework phase)
In order to meet the quality standards set by project plans and specifications or
as instructed by the contract requirements, Quality Management (QM)-
ANSWER comprises Quality Assurance and Quality Control operations.
Quality Control (QC) is the system used by the ANSWER engineering unit to
oversee, supervise, and record the unit's operations in accordance with the
project plans and specifications.
Unit QC Plan: The allocated QC specialists and the ANSWER unit QC manager
carry out and oversee tasks to carry out the unit level QC program.
Project QC Plan-ANSWER: Project managers and supervisors carry out and
oversee tasks to create their own project QC plans.
Quality assurance (QA) is the ANSWER-planned, methodical sequence of all
activities required to give assurance that sufficient technical requirements are
set, that goods and services meet those requirements, and that satisfactory
performance is attained.
Construction types: ANSWER Temporary, Semi-Permanent, and Permanent
Permanent: Response Over 25 years of life expectancy
Minimal upkeep costs
Only carried out by USACE
Semi-permanent: Response Life expectancy ranges from five to twenty-five
years.
Construction of troops may only be carried out by USACE.
Temporary Response Less than five years is the average lifespan.
Easily removable
VERIFIED ANSWERS
Response Options for USACE: ANSWER Reconnaissance Team (RT) or
Forward Engineer Support Team-Advance (FEST-A) Advanced Echelon
(ADVON) team Contingency Engineer District (CED)
Tasks for Reconnaissance: ANSWER **General Engineers: Technical
Reconnaissance
Infrastructure Survey, Environmental Evaluation, Airfield Evaluation, Route
Categorization, and Tactical Reconnaissance (**Combat Engineers)
Bridge Observation
Obstacle and Route Reconnaissance
Classification vs. Reconnaissance: General Engineers perform classification.
Combat Engineers conduct reconnaissance.
SWEAT-MSO-ANSWER Academics Trash Medical Safety Other
Considerations Sewage Water Electricity
Construction Planning and MDMP: ANSWER Construction planning and EN
standards for sustainability are where MDMP nests.
Project Origin/Routing: Respond to Unit inquiries on a DA4283
See DPW for authorization.
Make a list of requests for troop construction.
S3 and DPW sync for the project
After projects are selected, a project packet containing the site plan, drawings,
and scope of work is sent.
Construct Activities, BOM, and construction directives are produced by S3C.
The project was given to the executing business.
Definable Features of Work: During the estimating and scheduling phase, the
ANSWER project supervisor determines the features of the work. "Task which
is sperate and distinct from other tasks, has separate control requirements, and
, may be identified by different trades or disciplines, or it may be work by the
same trade in a different environment"
For every specified aspect of the work: ANSWER Apply network analysis,
scheduling, and estimation throughout the preparatory phase.
First Stage: Selecting equipment, materials, and configuration
Phase of Follow-Up: following established protocols
Phase of Completion: (in doctrine: rework phase)
In order to meet the quality standards set by project plans and specifications or
as instructed by the contract requirements, Quality Management (QM)-
ANSWER comprises Quality Assurance and Quality Control operations.
Quality Control (QC) is the system used by the ANSWER engineering unit to
oversee, supervise, and record the unit's operations in accordance with the
project plans and specifications.
Unit QC Plan: The allocated QC specialists and the ANSWER unit QC manager
carry out and oversee tasks to carry out the unit level QC program.
Project QC Plan-ANSWER: Project managers and supervisors carry out and
oversee tasks to create their own project QC plans.
Quality assurance (QA) is the ANSWER-planned, methodical sequence of all
activities required to give assurance that sufficient technical requirements are
set, that goods and services meet those requirements, and that satisfactory
performance is attained.
Construction types: ANSWER Temporary, Semi-Permanent, and Permanent
Permanent: Response Over 25 years of life expectancy
Minimal upkeep costs
Only carried out by USACE
Semi-permanent: Response Life expectancy ranges from five to twenty-five
years.
Construction of troops may only be carried out by USACE.
Temporary Response Less than five years is the average lifespan.
Easily removable