100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Bailey Bridge Exam Questions and Answers 100% Pass

Rating
-
Sold
-
Pages
2
Grade
A+
Uploaded on
12-12-2025
Written in
2025/2026

Bailey Bridge Exam Questions and Answers 100% Pass

Institution
Bailey Bridge
Course
Bailey Bridge








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Bailey Bridge
Course
Bailey Bridge

Document information

Uploaded on
December 12, 2025
Number of pages
2
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Bailey Bridge Exam Questions and Answers 100% Pass
Given a 210-foot TT bridge. What is the position of launching-nose links? - -30x40ft

-How many personnel does the routine repair detail consists of? - -6

-How many personnel does the maintenance party usually consist of for important bridges
subject to enemy action? - -entire assembly crew

-What is the required safety setback on an unprepared abutment if the bank height is 6
feet? - -(1.5) 6ft = 9ft

-Given a 140-foot TS bridge with grillage type 1 on both the near shore (NS) and far shore
(FS). The far-bank seat is level with the near-bank seat. What is the position of the
launching-nose links? - -20x40ft

-How is the initial bridge length determined? - -adding the width of the gap, the safety
setbacks, and the
roller clearances.

-What is the purpose of construction rollers? - -Aid in inserting the launching-nose links
and provide clearance between the links and the ground

-How many NCOs and enlisted members are on the transom crew to construct a TT Bailey
bridge? - -2 NCO, 28 enlisted

-What are the different types of stringers? - -plain, button

-How many unloading parties are needed for a 100-foot DS bridge? - -5

-How far should the extra set of plain rollers (called construction rollers) be placed
temporarily behind the rocking rollers when determining longitudinal spacing? - -12 1/2 ft

-What is the center-to-center roller spacing? - -14.10ft x 7.5ft

-Where are all of the measurements taken from for the rollers during site layout? - -The
center of the roller to the center of the next roller

-How many total personnel are needed to construct a TD Bailey bridge? (Manpower only) -
-98 (6 NCO, 92 enlisted)

-How many transoms per bay are required to support vehicles over class 70? - -4

-What is the assembly time for an 80-foot SS bridge during daylight with trained
personnel? - -2 hrs

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AccurateScores Not yet listed
View profile
Follow You need to be logged in order to follow users or courses
Sold
542
Member since
3 year
Number of followers
336
Documents
15259
Last sold
3 days ago

3.7

113 reviews

5
51
4
18
3
18
2
11
1
15

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions