DPWH PE PRACTICE EXAM | REALISTIC QUESTIONS AND ANSWERS

Instelling
DPWH PE
Vak
DPWH PE










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
DPWH PE
Vak
DPWH PE

Documentinformatie

Geüpload op
5 december 2025
Aantal pagina's
21
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

DPWH PE PRACTICE EXAM |
REALISTIC QUESTIONS AND
ANSWERS

What do you call the depth of water above the culvert inlet bottom - Answer- Headwater

What do you call the depth refers to the total depth of water from surface to a purge bed
level - Answer- Scoured

What is the formula used in computing price escalation - Answer- Parametric

What is the range of Spur Dike's top width - Answer- 1-2m

For concave sections, what is the distance between spur dike times the length of spur
(LS) - Answer- 1.4 to 1.8 x LS

For convex sections, what is the distance between spur dike times the length of spur
(LS) - Answer- 2.8 to 3.6 x LS

What term is used to indicate the maximum length of a designated upgrade on which a
loaded truck can operate without an unreasonable reduction in speed - Answer- Critical
length of Grade

What is the minimum Radius of Curve for a design speed of 30kph - Answer- 30m

What is the minimum bandwidth of the reflective tapes for traffic cones - Answer-
150mm

What is the standard maximum height for traffic bollards - Answer- 1.0m

What is the minimum bandwidth of the reflective tapes for traffic bollards - Answer-
250mm

Concrete Barriers need to be continuous or secured together, generally using steel pins
and eyelets, with a maximum __ gap to ensure they perform satisfactorily - Answer-
100mm

What is minimum dimension of square flags for STOP and GO - Answer- 600mm

What is the standard distance range for Road Warning Signs in advance of the
construction site for urban areas - Answer- 30-100m

,What is the standard distance range for Road Warning Signs in advance of the
construction site in rural areas - Answer- 75-225m

Barrier boards shall NOT be used for delineation purposes or installed parallel to
vehicular traffic unless there is an offset of at least __ from the travelled path - Answer-
4m

Traffic cones shall be spaced __ apart on tapers and around small work sites - Answer-
5 to 10 meters apart

What kind of reports are used to document events that occur at a plant or operation,
such as concrete batch plant or bituminous plant - Answer- Plant inspector's report

There are monthly or quarterly statements of time and cost for the project. The report
documents all changes that have accrued since the beginning of the project regarding
time and cost - Answer- General project status report

What kind of report are used to summarize the work progress for the immediate
preceding month or quarter, usually contains a narrative section describing status of
project, S-curve diagram, summary of contract time and change orders - Answer-
Contract performance reports

What kind of report are used to document any corrective changes which occur in the
field that would require departure from the plans and specifications and then provide the
necessary information to understand the problem, decide of how tor resolve it and issue
instructions to the field and serve as a source of document for variation order approvals
- Answer- Field correction reports

After the issuance of the "punch list" during the pre-final inspection, __ months-time
durations imposed to complete the project without penalties - Answer- 3

What should be conducted after the final inspection of a reported 100% accomplished
project, before a certificate of final inspection is to be issued - Answer- Exit Conference

If, after fifty percent (50%) completion, the Works are satisfactorily done and on
schedule, the amount of retention money will be limited to __ of the contract amount -
Answer- 10%

This represents the payment of the remaining balance of the contract including the total
retention after the completion of the project - Answer- Final Billing

The contractor will be allowed to file for the release of first partial billing if he had
satisfactorily completed at least __ of the contract - Answer- 20%

, When the spread footing located on a slope, the minimum distance from the lower edge
of the footing to the sloping ground surface should be __ - Answer- 900mm

What is the maximum spacing center to center of adjacent rings of circumferential
reinforcement in a cage of a standard two-meter RCPC - Answer- 100mm

For school building, footing shall rest at least __ below natural grade line - Answer-
1.50m

For buildings, the minimum concrete protection for reinforcement shall be __ clear for
concrete deposited to the ground - Answer- 75mm

For buildings, the minimum concrete protection for reinforcement shall be __ clear for
concrete deposited against a formwork - Answer- 50mm

What is the minimum days of stripping of Forms and Shores for suspended slabs in
school buildings - Answer- 8 days

What is the minimum days of stripping of Forms and Shores for walls and columns in
school buildings - Answer- 21 days

What is the minimum days of stripping of Forms and Shores for beams in school
buildings - Answer- 14 days

This is the guidelines on the Accreditation of Contractors' and Consultants' Project
Engineers - Answer- DO No. 10 of 2019

What is the minimum girder required for a one-lane bridge - Answer- 3 girders

What is the minimum girder required for a more than 2-lane bridge - Answer- 6 girders

Construction joints in floors shall be located within the __ of spans of slabs, beams, and
girders. Joints in the girders shall be offset a minimum distance of two times the width of
intersecting beam - Answer- L/3

All embedded pipes for utilities etc. that pass thru beams shall not exceed 100mm in
diameter or __ beam depth whichever is less, and no pipes shall be allowed to pass
thru beams vertically - Answer- 1/3

The ACI code gave a provision on structural integrity to perimeter beams is to splice
continuous top bars at __ and splice continuous bottom bars at or near supports -
Answer- Midspan

All doors for people with disability (PWD) shall have a minimum clear width of __ meter
- Answer- 0.90m

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
wisdompoint chamberlain college of nursing
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
114
Lid sinds
2 jaar
Aantal volgers
66
Documenten
5307
Laatst verkocht
16 uur geleden
Nursing Tec

3.7

16 beoordelingen

5
6
4
3
3
5
2
0
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen