Terms in this set (73)
What two plans in the Erosion and sediment control plans and stormwater
SWPPP must be management plans must be approved.
approved?
Does the stormwater The stormwater management plan addresses post-
management plan address construction stormwater runoff.
runoff during construction
or after?
Impervious cover increases stormwater runoff volume
What impact does
and velocity, leading to higher pollutant levels like
impervious cover have on
sediment and phosphorus, negatively affecting water
water quality?
quality.
What is the target Phosphorus
pollutant in the water
quality criteria?
What is the lower limit of 10%
imperviousness that can
result in stream
degradation?
, What destructive forces Channel erosion and flooding.
does the SWM regulation
protect against?
How does the rate of Runoff rate increases post-development due to
runoff change after vegetation replacement with impervious surfaces,
development? potentially causing erosion and flooding.
What must a locality's ESC plan and SWM plan (9VAC25-870-148)
ordinance require for
submission and approval?
Violations include: No registration date, No SWPPP,
Incomplete SWPPP, SWPPP not available for review,
List three violations for No approved ESC plan, Failure to install stormwater
which a penalty may be management BMPs or ESCs, Improperly installed or
imposed. maintained stormwater BMPs or ESCs, Operational
deficiencies, Failure to conduct required inspections,
Incomplete, improper, or missed inspections.
Maximum Penalty under $32,500
the Stormwater Act
Locality VSMP Authority Must be documented and retained for at least three
Registration Statement years from project completion or permit termination
Retention
DEQ Program Reviews DEQ conducts a program review once every five
Frequency years
Construction Site Periodically for compliance with ESC plan, SWM plan,
Inspection Frequency by pollution prevention plan, and TMDL control
VSMP Authority measures
Locations for Notice of Near main entrance of construction activity and in
Coverage Letter Posting general information section of SWPPP
Options for Making Electronic format or hard copy upon request at a
SWPPP Available to Public publicly accessible location
Questions & Answers | 100% Verified solutions
|Questions with Correct Answers 2025 latest
update!!
Save
Terms in this set (73)
What two plans in the Erosion and sediment control plans and stormwater
SWPPP must be management plans must be approved.
approved?
Does the stormwater The stormwater management plan addresses post-
management plan address construction stormwater runoff.
runoff during construction
or after?
Impervious cover increases stormwater runoff volume
What impact does
and velocity, leading to higher pollutant levels like
impervious cover have on
sediment and phosphorus, negatively affecting water
water quality?
quality.
What is the target Phosphorus
pollutant in the water
quality criteria?
What is the lower limit of 10%
imperviousness that can
result in stream
degradation?
, What destructive forces Channel erosion and flooding.
does the SWM regulation
protect against?
How does the rate of Runoff rate increases post-development due to
runoff change after vegetation replacement with impervious surfaces,
development? potentially causing erosion and flooding.
What must a locality's ESC plan and SWM plan (9VAC25-870-148)
ordinance require for
submission and approval?
Violations include: No registration date, No SWPPP,
Incomplete SWPPP, SWPPP not available for review,
List three violations for No approved ESC plan, Failure to install stormwater
which a penalty may be management BMPs or ESCs, Improperly installed or
imposed. maintained stormwater BMPs or ESCs, Operational
deficiencies, Failure to conduct required inspections,
Incomplete, improper, or missed inspections.
Maximum Penalty under $32,500
the Stormwater Act
Locality VSMP Authority Must be documented and retained for at least three
Registration Statement years from project completion or permit termination
Retention
DEQ Program Reviews DEQ conducts a program review once every five
Frequency years
Construction Site Periodically for compliance with ESC plan, SWM plan,
Inspection Frequency by pollution prevention plan, and TMDL control
VSMP Authority measures
Locations for Notice of Near main entrance of construction activity and in
Coverage Letter Posting general information section of SWPPP
Options for Making Electronic format or hard copy upon request at a
SWPPP Available to Public publicly accessible location