MISY 5340 EXAM 2 QUESTIONS WITH
100% CORRECT ANSWERS LATEST
VERSION 2025/2026.
Which of the following are key organizational data relevant to the production process?
a. company code
b. credit control area
c. client
d. storage location
e. plant - ANS company code
client
storage location
plant
The master data relevant to the production process are:
a. work center
b. material master
c. bill of material
d. client
1 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.
,e. company code - ANS work center
material master
bill of material
What are the basic time elements in the production process?
a. setup time
b. alternate time
c. build time
d. teardown time
e. processing time - ANS setup time
teardown time
processing time
Which of the following can be included in processing time?
a. machine time
b. configuring work center
c. configuring equipment
d. labor time
e. setup time - ANS machine time
labor time
Which of the following are the general classifications of time elements in production?
a. floating
2 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.
,b. volatile
c. fixed
d. explosive
e. variable - ANS fixed
variable
The material master is grouped into different views or segments based on which factors?
a. processes that use the materials
b. material type
c. organizational level
d. material composition
e. material description - ANS processes that use the material
material type
organizational level
A planned order is a formal request that indicates:
a. how many units of a product are needed
b. where the finished goods are to be shipped
c. what materials are needed
d. where the raw materials are stored
e. when the materials are needed - ANS how many units of a product are needed
what materials are needed
when the materials are needed
3 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.
, What are the organizational data that are included in a planned order?
a. client
b. company code
c. plant
d. storage location
e. bill of materials - ANS client
company code
plant
storage location
Which are the following are options when a production manager receives a planned order?
a. create an alternate planned order
b. reject the planned order
c. combine the planned order with other orders
d. authorize the production
e. return the order to purchasing - ANS reject the planned order
combine the planned order with other orders
authorize the production
A production order typically include references to which of the following?
a. BOM
b. routing
c. work centers
4 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.
100% CORRECT ANSWERS LATEST
VERSION 2025/2026.
Which of the following are key organizational data relevant to the production process?
a. company code
b. credit control area
c. client
d. storage location
e. plant - ANS company code
client
storage location
plant
The master data relevant to the production process are:
a. work center
b. material master
c. bill of material
d. client
1 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.
,e. company code - ANS work center
material master
bill of material
What are the basic time elements in the production process?
a. setup time
b. alternate time
c. build time
d. teardown time
e. processing time - ANS setup time
teardown time
processing time
Which of the following can be included in processing time?
a. machine time
b. configuring work center
c. configuring equipment
d. labor time
e. setup time - ANS machine time
labor time
Which of the following are the general classifications of time elements in production?
a. floating
2 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.
,b. volatile
c. fixed
d. explosive
e. variable - ANS fixed
variable
The material master is grouped into different views or segments based on which factors?
a. processes that use the materials
b. material type
c. organizational level
d. material composition
e. material description - ANS processes that use the material
material type
organizational level
A planned order is a formal request that indicates:
a. how many units of a product are needed
b. where the finished goods are to be shipped
c. what materials are needed
d. where the raw materials are stored
e. when the materials are needed - ANS how many units of a product are needed
what materials are needed
when the materials are needed
3 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.
, What are the organizational data that are included in a planned order?
a. client
b. company code
c. plant
d. storage location
e. bill of materials - ANS client
company code
plant
storage location
Which are the following are options when a production manager receives a planned order?
a. create an alternate planned order
b. reject the planned order
c. combine the planned order with other orders
d. authorize the production
e. return the order to purchasing - ANS reject the planned order
combine the planned order with other orders
authorize the production
A production order typically include references to which of the following?
a. BOM
b. routing
c. work centers
4 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.