ACTUAL EXAM 2026 QUESTIONS WITH
ANSWERS GRADED A+
◉ 2. In a balance hose the gasoline flows in. Answer: Inner hose
◉ 3. After the installation of the vapor piping and before back filling,
PEI 300 suggests some methods to document piping layout, except.
Answer: Drawing with a pen, pipe layout on the cover of the tank
manual.
◉ 4. During VO-1000 you don't. Answer: Work without eye protection
◉ 5. An Overfill Alarm device needs to be located. Answer: Where it
can be heard or seen by the delivery location.
◉ 6. When in a GDF you can avoid the installation of UDC. Answer: No
exceptions of any GDF.
◉ 7. What is considered an Underground Storage Tank. Answer: Tank
and pipping only
, ◉ 8. Gasoline vapors are 3/4 times _____ than air. Answer: Heavier
◉ 9. Compounds with a high vapor pressure such as gasoline will
evaporate readily and will typically. Answer: Have a low Flashpoint.
◉ 10. The ____ is the valve that controls pressure and vacuum on the
tank.. Answer: P/V Valve
◉ 11. The vapor piping must be all, but not. Answer: Compatible with
underground environment.
◉ 12. The Shear Valve is installed ____. Answer: At the base of the
dispenser.
◉ 13. What is the max length of a Healy Hose Phase 2. Answer: 20 Feet.
◉ 14 A ___ is a component of the hanging hardware that separates when
it's applied a force. Answer: Breakaway.
◉ 15. UL listed means all except :. Answer: Worldwide Approved.