100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ATSSA TRAFFIC CONTROL SUPERVISOR "THE TYPICAL PROJECT" MODULE 7 QUESTIONS AND ANSWERS 2026/2027 A+ GRADED 100% VERIFIED

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
21-11-2025
Written in
2025/2026

ATSSA TRAFFIC CONTROL SUPERVISOR "THE TYPICAL PROJECT" MODULE 7 QUESTIONS AND ANSWERS 2026/2027 A+ GRADED 100% VERIFIED

Institution
ATSSA Traffic Control Supervisor
Course
ATSSA Traffic Control Supervisor









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ATSSA Traffic Control Supervisor
Course
ATSSA Traffic Control Supervisor

Document information

Uploaded on
November 21, 2025
Number of pages
10
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ATSSA TRAFFIC CONTROL
SUPERVISOR "THE TYPICAL
PROJECT" MODULE 7 QUESTIONS
AND ANSWERS 2026/2027 A+ GRADED
100% VERIFIED
Planning

What stage:
Gather available data
Prior to occupying TTC zone
Consider the needs of all users
Coordinate between adjacent or overlapping projects

Design

What stage:
Select best traffic control alternative
based on: safety, mobility, cost, constructability

Traffic Factors, characteristics, and speed.
Traffic controls, urban features, and traffic generators

What Factors effect the design of a TTC plan

Long-term stationary
Intermediate-term stationary
short-term stationary
short-duration
mobile

What are the MUTCD categories of Work Duration?

Occupies location more than 3 days
larger channelizing devices and post mounted signs

, conflicting roadway markings removed and replaced with temporary markings
cover or remove conflicting signage

Long-term stationary (MUTCD work duration category)

More than 1 day, less than 3 days
Nightime work of more than 1 hour

Intermediate-stationary (MUTCD work duration category)

Daytime work 1 to 12 hours
cones and portable signs

Short-term stationary (MUTCD work duration category)

work that moves intermittently or continuously
May use truck-mounted impact attenuators

Mobile (MUTCD work duration category)

Constructability

Nature of the work
access requirements
drainage issues, drainage during construction
construction equipment
size of work space
Access to work area
room to maneuver equipment

Outside the shoulder
On the shoulder with no encroachment
on the shoulder with minor encroachment
within the median
within the traveled way

MUTCD "Locations of work"

Phasing

Refers to TTC projects being broken into multiple steps
Could be dangerous due to devices and workers on the move
coordination and timing are key

Public relations

Working with the media
News announcements
Phone hotline
door hangers / notices

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AVERYSELLER Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
265
Member since
2 year
Number of followers
122
Documents
3112
Last sold
2 weeks ago

3.8

40 reviews

5
18
4
6
3
8
2
4
1
4

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions