B111 NJ High Pressure Black Seal Exam with ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
accurate detailed solutions ||\\//|| ||\\//||
What ASME code symbol is used to denote a high pressure power boiler?
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
S
3 multiple choice options
||\\//|| ||\\//|| ||\\//||
According to the regulation, a licensed operator on watch shall give constant attention and
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
remain within sight and natural sound in both HP and LP boilers. T / F
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
false
1 multiple choice option
||\\//|| ||\\//|| ||\\//||
What is the range of capacity that a High Pressure Boiler Operator can be the Chief Engineer
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
and work as Shift Engineer (stand watch) based on the 12:90 Boiler, Pressure Vessel and
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Refrigeration rules? ||\\//||
Can act as Chief Engineer and stand watch of a plant with a minimum capacity of 100 HP
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
and up to 500 HP ||\\//|| ||\\//|| ||\\//|| ||\\//||
3 multiple choice options
||\\//|| ||\\//|| ||\\//||
, Any person found performing the duties of a license and holding an expired license, shall be
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
subject to what type of penalty? ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
They shall be subject to a min penalty of $500 up to a max of $5,000 per day.
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
3 multiple choice options
||\\//|| ||\\//|| ||\\//||
Pursuant to N.J.A.C. 12:90, what is the temperature and pressure that defines a high-
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
temperature hot water heating boiler? ||\\//|| ||\\//|| ||\\//|| ||\\//||
exceeds 250 degrees F at 160 psi ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
3 multiple choice options
||\\//|| ||\\//|| ||\\//||
Why are staybolts used in the construction of HRT power boilers?
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
to strengthen and support flat plates on a fire-tube boiler
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
3 multiple choice options
||\\//|| ||\\//|| ||\\//||
In a fire-tube boiler, how are the tubes usually attached to the tube sheet?
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
by rolling the tubes and beading the ends
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
3 multiple choice options
||\\//|| ||\\//|| ||\\//||
How are the tube sheets supported in a fire-tube boiler?
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
accurate detailed solutions ||\\//|| ||\\//||
What ASME code symbol is used to denote a high pressure power boiler?
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
S
3 multiple choice options
||\\//|| ||\\//|| ||\\//||
According to the regulation, a licensed operator on watch shall give constant attention and
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
remain within sight and natural sound in both HP and LP boilers. T / F
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
false
1 multiple choice option
||\\//|| ||\\//|| ||\\//||
What is the range of capacity that a High Pressure Boiler Operator can be the Chief Engineer
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
and work as Shift Engineer (stand watch) based on the 12:90 Boiler, Pressure Vessel and
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Refrigeration rules? ||\\//||
Can act as Chief Engineer and stand watch of a plant with a minimum capacity of 100 HP
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
and up to 500 HP ||\\//|| ||\\//|| ||\\//|| ||\\//||
3 multiple choice options
||\\//|| ||\\//|| ||\\//||
, Any person found performing the duties of a license and holding an expired license, shall be
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
subject to what type of penalty? ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
They shall be subject to a min penalty of $500 up to a max of $5,000 per day.
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
3 multiple choice options
||\\//|| ||\\//|| ||\\//||
Pursuant to N.J.A.C. 12:90, what is the temperature and pressure that defines a high-
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
temperature hot water heating boiler? ||\\//|| ||\\//|| ||\\//|| ||\\//||
exceeds 250 degrees F at 160 psi ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
3 multiple choice options
||\\//|| ||\\//|| ||\\//||
Why are staybolts used in the construction of HRT power boilers?
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
to strengthen and support flat plates on a fire-tube boiler
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
3 multiple choice options
||\\//|| ||\\//|| ||\\//||
In a fire-tube boiler, how are the tubes usually attached to the tube sheet?
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
by rolling the tubes and beading the ends
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
3 multiple choice options
||\\//|| ||\\//|| ||\\//||
How are the tube sheets supported in a fire-tube boiler?
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||