100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

CON 367 Construction Estimating & Cost Analysis

Puntuación
-
Vendido
-
Páginas
9
Grado
A+
Subido en
18-11-2025
Escrito en
2025/2026

CON 367 MIDTERM EXAM NEWEST 2025/2026 WITH COMPLETE QUESTIONS AND CORRECT ANSWERS |ALREADY GRADED A+||BRAND NEW VERSION!!!!

Institución
CON 367
Grado
CON 367









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CON 367
Grado
CON 367

Información del documento

Subido en
18 de noviembre de 2025
Número de páginas
9
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CON 367 MIDTERM EXAM NEWEST 2025/2026 WITH COMPLETE
QUESTIONS AND CORRECT ANSWERS |ALREADY GRADED
A+||BRAND NEW VERSION!!!!




Routing of submittals from the subcontractor to the Designer - CORRECT ANSWER-1.
Subcontractor

2. Contractor

3. Resident Project Representative

4. Project Engineer

5. Design Reviews



The Resident Project Representative should obtain the contract documents and study those as
soon as being engaged to provide resident inspection on a project. - CORRECT ANSWER-True



The Resident Project Representative does not need to make any measurement for the progress
payments in the lump-sum projects - CORRECT ANSWER-False



When the Resident Project Representative identifies a problem with the subcontractor's work,
he/she should provide instructions directly to the subcontractor. - CORRECT ANSWER-False



In a construction project, the general contractor should submit all submittals (e.g., shop
drawings, samples, etc...) directly to: - CORRECT ANSWER-

, If the daily Construction Report is generated in the computer, it is advisable that the Resident
Project Representative prints a hard copy, signs it, and files it at the end of each business day. -
CORRECT ANSWER-True



One way of making bid advertisements, as becoming more popular each day, is to post them on
the World Wide Web (internet website). - CORRECT ANSWER-True



The web-based project management systems help reduce turnaround time on communications
and improved access to project paperwork. - CORRECT ANSWER-True



The process of initiating a construction project. - CORRECT ANSWER-1. Advertise for bids

2. Open bids

3. Award contract

4. Sign the contract

5. Issue notice to proceed



Under the Contractor Quality Control (CQC) process, inspection is provided by the contractor -
CORRECT ANSWER-False



Owners generally engage the services of a professional construction management firm (Agency
CM) in fast-track projects with multiple contracts. - CORRECT ANSWER-True



A professional construction management firm (Agency CM) can participate in the following
phases of a project - CORRECT ANSWER-Conception, program planning, Design, Construction
and Closeout



The Design-Build (DB) project delivery process may face some barriers when tried to be
implemented in the public sector. - CORRECT ANSWER-True



In a project with multiple prime contractors, who is responsible for coordinating the various trade
contractors? - CORRECT ANSWER-Owner or its representative (e.g. the construction manager)
$16.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
DoctorDee

Conoce al vendedor

Seller avatar
DoctorDee Teachme2-tutor
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
11
Miembro desde
2 año
Número de seguidores
6
Documentos
1918
Última venta
3 semanas hace
Hi wayne1111

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes