100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Samenvatting

Summary System Analysis and Design Chapter 11

Beoordeling
-
Verkocht
-
Pagina's
10
Geüpload op
15-11-2025
Geschreven in
2025/2026

This document provides an in depth and thorough summary of chapter 11 of System Analysis and Design. It is ready for exam and tests. Everything is laid out as it is in the textbook. All needed information is provided in short. It is written in an easy to study format and reads easy. I got distinctions in exams and tests.

Meer zien Lees minder
Instelling
Vak









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Gekoppeld boek

Geschreven voor

Instelling
Vak

Documentinformatie

Heel boek samengevat?
Nee
Wat is er van het boek samengevat?
11
Geüpload op
15 november 2025
Aantal pagina's
10
Geschreven in
2025/2026
Type
Samenvatting

Onderwerpen

Voorbeeld van de inhoud

Chapter 11
Principles of Project Management:
The Need for Project Management
 Categories of project success
 Successful projects – on time, within budget, on scope
 Challenged projects – failure in one area
 Failed projects – cancelled or not used




Reasons for failure
 Undefined project management practices
 Poor IT management and poor IT procedures
 Inadequate executive support for the project
 Inexperienced project managers
 Unclear business needs and project objectives
 Inadequate user involvement


The Role of the Project Manager
 Project Management
 Organizing and directing other people to achieve a planned result within a predetermined
schedule and budget
 The processes used to plan the project and then to monitor and control it.
 Project Manager
 Internally managing people and resources
 Externally conducting public relations


Project Manager Responsibilities
 Internal Responsibilities
 Developing the project schedule
 Recruiting and training team members
 Assigning work to teams and team members
 Assessing project risks
 Monitoring and controlling project deliverables and milestones
 External Responsibilities

,  Reporting the project’s status and progress
 Working directly with the client (the project’s sponsor) and other stakeholders
 Identifying resource needs and obtaining resources


Additional Project Stakeholders
 Client
 the person or group that funds the project
 Oversight Committee
 clients and key managers who review the progress and direct the project
 Users
 the person or group of people who will use the new system


Project Management and Ceremony
 Ceremony
 The level of formality of a project; the rigor of holding meetings and producing documentation
 High Ceremony
 Meetings are often held on a predefined schedule, with specific participants, agendas,
minutes, and follow-through
 Specifications are formally documented with an abundance of diagrams and documentation
and are frequently verified through formal review meetings between developers and users.
 Low Ceremony
 Meetings occur in the hallway or around the water cooler.
 Written documentation, formal specifications, and detailed models are kept to a minimum
 Developers and users usually work closely together on a daily basis to define requirements
and develop the system


Project Management Body of Knowledge (PMBOK)
PMPOK is organized into 10 knowledge areas:

1. Project Integration Management - Integrating all the other knowledge areas into one
seamless whole
2. Project Scope Management - Defining and controlling the functions that are to be included in
the system as well as the scope of the work to be done by the project team
3. Project Time Management - Creating a detailed schedule of all project tasks and then
monitoring the progress of the project against defined milestones
4. Project Cost Management - Calculating the initial cost/benefit analysis and its later updates
and monitoring expenditures as the project progresses
5. Project Quality Management - Establishing a comprehensive plan for ensuring quality, which
includes quality control activities for every phase of a project
6. Project Human Resource Management - Recruiting and hiring project team members;
training, motivating, and team building; and implementing related activities to ensure a happy,
productive team
$3.90
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
tanjanel1303 Rosebank College (Pretoria)
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
10
Lid sinds
1 jaar
Aantal volgers
2
Documenten
47
Laatst verkocht
2 maanden geleden

5.0

2 beoordelingen

5
2
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen