Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

FDOT FINAL ESTIMATES - LEVEL 1 EXAM QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) ||ALREADY GRADED A+||NEWEST VERSION

Document preview thumbnail
Preview 2 out of 6 pages

FDOT FINAL ESTIMATES - LEVEL 1 EXAM QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) ||ALREADY GRADED A+||NEWEST VERSION

Content preview

FDOT FINAL ESTIMATES - LEVEL 1
EXAM QUESTIONS AND CORRECT
DETAILED ANSWERS (VERIFIED
ANSWERS) ||ALREADY GRADED
A+||NEWEST VERSION




QUESTIONS AND ANSWERS
What two types of Estimates are needed to pay for the work performed by contractors?
ANSWER -Final & Progress Monthly


In case of discrepancies among the contract documents, which document takes the highest
precedence? ANSWER -Special Provisions


Contractors Recieve progress payments on the basis of? ANSWER -Monthly Progress
Estimates


Which of the following sets forth the Department's methods and procedures for preparing
and checking final estimates? ANSWER -Preparation and Documentation Manual (PDM)

, Which Document contains a series of Specially designed forms that show both original
estimates of quantities and the final quantities as measured ad accepted? ANSWER -
Computation Books


Which Document contains alignment notes, cross-section notes, linear and area
measurements and dimension sketches? ANSWER -Field Notebooks


Where are major changes during construction documented and "as-built" conditions
shown? ANSWER -Field Notebooks


What identification is needed to show on the front cover of a field book? ANSWER -FEID,
Contract number, General contents of the book


When making corrections to a field book entry, you should: ANSWER -strike through,
initial and enter correct data and date


What should be started on the first lined page (page 1) of a field book? ANSWER -INDEX


An entire page of a field notebook you are using is incorrect, what do you do to correct the
situation? ANSWER -Mark the page VOID and reference it to a new page showing the
correct information.


"Check Levels" must be run at the start of a construction project to assure that: ANSWER -
Construction will be done to design elevations & final measurements for payment will be
from the same base elevations as the original survey.


What should accompany final measurements so that nonstandard measurements may be
interpreted accurately? ANSWER -Sketches


In the REMARKS column of most computation book forms a reference should be made to
the: ANSWER -Source Documents


When is it permissible to record only the net weight on an asphaltic concrete tabulation
form? ANSWER -Never, gross tare must be included also

Document information

Uploaded on
November 13, 2025
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
8
Followers
0
Items
1088
Last sold
1 month ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions