WGU C215 Pre-assessment PVDC Questions and Answers Verified 100% Correct What is a major factor in the decision to locate a business near its primary market territory? - ANSWER -Proximity to customers A manufacturing company decides to open a new distribution center location in order to minimize distribution costs to warehouses or stores. What tool should the manufacturing company use to determine where the new distribution center should be located? - ANSWER -By using the center-of-gravity approach Which two types of operations include repetitive processes? - ANSWER -Line process Continuous process A comprehensive automobile collision shop offers body and engine repair as well as custom vehicle paint options. Which two operational processes would suit this shop? - ANSWER -Project process Batch process What is a bottleneck in a flowchart? - ANSWER -The longest task in the process Which formula would compute process velocity? - ANSWER -Throughput time/value-added time Which formula would indicate that a fast-food restaurant was performing at, above, or below its benchmark? - ANSWER -Actual output/standard output In which organizational layout would one expect to see items arranged by type? - ANSWER -Process A construction company produces furnished pre-fabricated manufactured homes. The production manager has discovered the following challenges within one of the facilities: - Production qualities are low and only a small number of homes are built efficiently - The facility space allows for low handling of materials - There is limited space available for employees to operate Which hybrid layout should be used to address the company's needs? - ANSWER -Group technology Which instrument would use an allocation process for space requirements in an industry scenario? - ANSWER -Block plan What would be an organization's next step after it has revised or implemented new operations? - ANSWER -Follow up to make sure the new operation resolves quality problems Why is it beneficial for an organization to designate employees to communicate alternative ways to complete a job in a methods analysis? - ANSWER -They may have suggestions for improving the operation. Which factor determines how long it takes a qualified operator to perform a duty of the job requirements under the assumption that the operator is working at a sustainable pace with the proper tools for the process? - ANSWER -Standard time Which design work system minimizes repetitiveness in tasks by assigning employees the role of planning and scheduling? - ANSWER -Job enrichment Which work system acknowledges the benefits of employee proficiency? - ANSWER -Labor specialization Which term means to schedule a job that starts immediately, regardless of the due date? - ANSWER -Forward scheduling What is the third basic element in the just-in-time (JIT) system if the first element is total quality management (TQM) and the second is JIT manufacturing? - ANSWER -Respect for people How of just-in-time (JIT) and lean systems add value? - ANSWER -By reducing waste Which concept takes a total system approach to creating an efficient operation and combines concepts such as just-in-time (JIT), total quality management (TQM), and continuous improvement? - ANSWER -Lean systems Why is Kanban significant to the "pull" system? - ANSWER -It specifies the exact quantity of a product that needs to be produced What are two product system differences between the push and pull process? - ANSWER -Push moves the product forward in anticipation for demand. Pull eliminates excess inventory. Which function does marketing play in a just-in-time (JIT) organization? - ANSWER -JIT marketing focuses on customer-driven quality. How does a just-in-time (JIT) system influence all functional areas within a company? - ANSWER -Companies are able to reduce waste. Companies develop new ways to generate revenue. What are two ways management can assist employees' focus in a just-in-time (JIT) processing environment? - ANSWER -Ensure that workers receive multifunctional training Develop an incentive system to reward workers for their efforts Which tier-level supplier directly supplies materials or services to a processing and packaging plant? - ANSWER -Tier three suppliers Which role do third-party logistics providers play in the supply chain? - ANSWER -External distributors A company manufactures and distributes its own products. When should the company consider outsourcing its distribution? - ANSWER

Mostrar más Leer menos
Institución
WGU C215 Pre-assessment PVDC
Grado
WGU C215 Pre-assessment PVDC









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
WGU C215 Pre-assessment PVDC
Grado
WGU C215 Pre-assessment PVDC

Información del documento

Subido en
13 de noviembre de 2025
Número de páginas
8
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

WGU C215 Pre-assessment PVDC Questions and
Answers Verified 100% Correct
What is a major factor in the decision to locate a business near its primary market
territory? - ANSWER -Proximity to customers

A manufacturing company decides to open a new distribution center location in
order to minimize distribution costs to warehouses or stores.

What tool should the manufacturing company use to determine where the new
distribution center should be located? - ANSWER -By using the center-of-gravity
approach

Which two types of operations include repetitive processes? - ANSWER -Line
process

Continuous process

A comprehensive automobile collision shop offers body and engine repair as well
as custom vehicle paint options.

Which two operational processes would suit this shop? - ANSWER -Project
process

Batch process

What is a bottleneck in a flowchart? - ANSWER -The longest task in the process

Which formula would compute process velocity? - ANSWER -Throughput
time/value-added time

Which formula would indicate that a fast-food restaurant was performing at,
above, or below its benchmark? - ANSWER -Actual output/standard output

In which organizational layout would one expect to see items arranged by type? -
ANSWER -Process

, A construction company produces furnished pre-fabricated manufactured homes.
The production manager has discovered the following challenges within one of the
facilities:

- Production qualities are low and only a small number of homes are built
efficiently
- The facility space allows for low handling of materials
- There is limited space available for employees to operate

Which hybrid layout should be used to address the company's needs? - ANSWER
-Group technology

Which instrument would use an allocation process for space requirements in an
industry scenario? - ANSWER -Block plan

What would be an organization's next step after it has revised or implemented new
operations? - ANSWER -Follow up to make sure the new operation resolves
quality problems

Why is it beneficial for an organization to designate employees to communicate
alternative ways to complete a job in a methods analysis? - ANSWER -They may
have suggestions for improving the operation.

Which factor determines how long it takes a qualified operator to perform a duty
of the job requirements under the assumption that the operator is working at a
sustainable pace with the proper tools for the process? - ANSWER -Standard time

Which design work system minimizes repetitiveness in tasks by assigning
employees the role of planning and scheduling? - ANSWER -Job enrichment

Which work system acknowledges the benefits of employee proficiency? -
ANSWER -Labor specialization

Which term means to schedule a job that starts immediately, regardless of the due
date? - ANSWER -Forward scheduling

What is the third basic element in the just-in-time (JIT) system if the first element
is total quality management (TQM) and the second is JIT manufacturing? -
ANSWER -Respect for people
$11.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TheExamMaestro Teachme2-tutor
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
121
Miembro desde
1 año
Número de seguidores
5
Documentos
3167
Última venta
1 semana hace
Exam Vault

Exam Vault is your trusted destination for high-quality exam materials and study resources. We provide a wide rage of tests and prep guides to help you succeed, whether you're preparing for academic exams, certifications, or professional assessments

3.8

13 reseñas

5
7
4
2
3
1
2
0
1
3

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes