100 Practice Questions and Answers for CNT Exam
Prep | Clean Needle Technique – CNT exam
Answered Practice Questions Latest
If a foreman from a different trade approaches you
claiming that one of your crew members has been injured
while working outside of his scope of work, what would
be the FIRST action you should take? - ...ANSWER...✓✓
Get the crew member medical attention.
Which of the following is a true statement with respect to
a foreman 's responsibility related to his or her crew? -
...ANSWER...✓✓ The foreman is responsible for anything
that occurs at the jobsite from the beginning of the work
day/shift to the end of the work day/shift.
Why is preparation so important in a negotiation? -
...ANSWER...✓✓ Having time to prepare and having a plan
makes it easier to keep emotions in check.
The piping specifications required all wall penetrations to
have a steel pipe sleeve.The steam piping size is 4 inches
SCH 80 carbon steel with 1 inch of fiberglass insulation.
,2|Page
What diameter of SCH 40 carbon steel sleeve is the
minimum that you can use? - ...ANSWER...✓✓ 8 inches
A member of your crew is being excessively loud and
using inappropriate language. As a foreman, what is the
MOST effective course of action to take? - ...ANSWER...✓✓
Explain to them that their behavior is inappropriate and
may be considered harassment by fellow crew members
and by management
What is the purpose of a separation notice? -
...ANSWER...✓✓ The purpose of a separation notice is to
identify the circumstances surrounding a termination.
With which of the following costs should a foreman be
MOST concerned? - ...ANSWER...✓✓ Labor
A(n) ________________ occurs when any condition or
document modifies the work as defined in the contract
documents during the bidding process. - ...ANSWER...✓✓
Change Order
, 3|Page
On a project that requires 100% tie-off for elevated work,
how many lanyards are required on a full body harness? -
...ANSWER...✓✓ 2
The client is not happy with part of the project and wants
to make a change. What actions should you take to
ensure the client is happy while ensuring that progress
on your job continues? - ...ANSWER...✓✓ Stop working on
that portion of the job that is at issue and contact your
supervisor.
Using drawing, what is the elevation of the top of the 24 x
18 duct? - ...ANSWER...✓✓ 31 feet and 10 inches.
On the project blueprint there is a bank of four pipe runs
with each pipe measuring three inches in diameter which
measure 12 inches in length on the blueprint. The scale
used on the blueprint is 1/4 inch equals 1 foot. How many
feet of 3 inch pipe should be ordered to complete the
runs? - ...ANSWER...✓✓ 192 feet
Using the formula below, what is the correct 45 offset
when you have a rolling offset where the roll is 8 inches