The |offset |of |the |jib |has |been |changed |from |25 |degree |to |15 |degree. |The |capacity |of |the |jib |
will?
A. |Stay |the |same
B. |Decrease
C. |Offset |can't |change
D. |Increase |- |CORRECT |ANSWER✔✔-D. |Increase
When |lifting |near |capacity |with |a |crawler, |the |lowest |ground |pressure |between |center |pin |and
|the |load |will |be? |
A. |Over |the |front
B. |Over |the |corner
C. |Over |the |side
D. |Over |the |rear |- |CORRECT |ANSWER✔✔-C. |Over |the |side
A |Truck |mounted |crane |will |generally |have |a |higher |capacity |over |which |quadrant?
A. |Capacity |is |the |same |360 |degrees
B. |Over |the |rear
C. |Capacity |is |higher |over |the |side
D. |Over |the |front |- |CORRECT |ANSWER✔✔-B. |Over |the |rear
,When |lifting |from |main |boom |with |a |60' |jib |attached, |a |deduction |must |be |made |for?
A. |Stowed |jib
B. |Fixed |jib
C. |Erected |jib
D. |Stored |jib |- |CORRECT |ANSWER✔✔-C. |Erected |jib
During |Tandem |lifts, |neither |crane |should |be |loaded |more |than?
A. |50%
B. |65%
C. |75%
D. |80% |- |CORRECT |ANSWER✔✔-C. |75%
A |chocker |has |a |vertical |hitch |capacity |of |6,000 |lbs |with |a |5:1 |safety |factor. |The |actual |capacity
|is?
A. |30,000 |lbs
B. |11,000 |lbs
C. |3,000 |lbs
D. |6,000 |lbs |- |CORRECT |ANSWER✔✔-D. |6,000 |lbs
Mobile |cranes |are |generally |required |to |be |level |within?
A. |1 |degree
B. |1%
,C. |1'
D. |1" |- |CORRECT |ANSWER✔✔-B. |1%
A |power |line |is |rated |330kv, |the |closest |a |crane |with |150' |boom |can |get |without |a |spotter |is?
A. |200'
B. |20'
C. |170'
D. |50' |- |CORRECT |ANSWER✔✔-C. |170'
ASME |recommends, |when |hoisting |personnel, |line |speeds |of
A. |No |more |than |100 |f/m
B. |No |more |than |necessary
C. |No |more |than |100 |f/s
D. |No |speed |recommendation |- |CORRECT |ANSWER✔✔-A. |No |more |than |100 |f/m
Rigging, |custom |hooks, |clamps, |spreader |beams, |etc. |Shall |be |proof |tested |to |______ |of |
capacity |
A. |100%
B. |125%
C. |110%
D. |115% |- |CORRECT |ANSWER✔✔-B. |125%
Blocking |under |outrigger |pads |should |be |what |size?
, A. |Equal |to |the |pad
B. |Three |times |larger |than |the |pad
C. |Smaller |than |the |pad
D. |Five |times |larger |than |the |pad |- |CORRECT |ANSWER✔✔-B. |Three |times |larger |than |the |pad
When |a |crane |is |out |of |level, |the |capacity |reduction |is |greatest |in |which |configuration?
A. |Short |boom, |minimum |radius
B. |Long |boom, |maximum |radius
C. |Short |boom, |maximum |radius
D. |Long |boom, |minimum |radius |- |CORRECT |ANSWER✔✔-D. |Long |boom, |Minimum |radius
The |crane's |anti-two |block |stopped |working. |Per |OSHA, |how |soon |must |it |be |repaired?
A. |Immediately
B. |Within |30 |days
C. |Before |end |of |shift
D. |Within |7 |days |- |CORRECT |ANSWER✔✔-D. |Within |7 |days
Which |is |the |OSHA |criteria |for |removing |running |rope?
A. |Six |random |broken |wires |in |one |lay |or |three |broken |wires |in |one |strand |in |one |lay
B. |2 |random |broken |wires |in |6 |diameters |or |4 |in |30 |diameters
C. |3 |random |broken |wires |in |6 |diameters |or |in |6 |in |12 |diameters
The |offset |of |the |jib |has |been |changed |from |25 |degree |to |15 |degree. |The |capacity |of |the |jib |
will?
A. |Stay |the |same
B. |Decrease
C. |Offset |can't |change
D. |Increase |- |CORRECT |ANSWER✔✔-D. |Increase
When |lifting |near |capacity |with |a |crawler, |the |lowest |ground |pressure |between |center |pin |and
|the |load |will |be? |
A. |Over |the |front
B. |Over |the |corner
C. |Over |the |side
D. |Over |the |rear |- |CORRECT |ANSWER✔✔-C. |Over |the |side
A |Truck |mounted |crane |will |generally |have |a |higher |capacity |over |which |quadrant?
A. |Capacity |is |the |same |360 |degrees
B. |Over |the |rear
C. |Capacity |is |higher |over |the |side
D. |Over |the |front |- |CORRECT |ANSWER✔✔-B. |Over |the |rear
,When |lifting |from |main |boom |with |a |60' |jib |attached, |a |deduction |must |be |made |for?
A. |Stowed |jib
B. |Fixed |jib
C. |Erected |jib
D. |Stored |jib |- |CORRECT |ANSWER✔✔-C. |Erected |jib
During |Tandem |lifts, |neither |crane |should |be |loaded |more |than?
A. |50%
B. |65%
C. |75%
D. |80% |- |CORRECT |ANSWER✔✔-C. |75%
A |chocker |has |a |vertical |hitch |capacity |of |6,000 |lbs |with |a |5:1 |safety |factor. |The |actual |capacity
|is?
A. |30,000 |lbs
B. |11,000 |lbs
C. |3,000 |lbs
D. |6,000 |lbs |- |CORRECT |ANSWER✔✔-D. |6,000 |lbs
Mobile |cranes |are |generally |required |to |be |level |within?
A. |1 |degree
B. |1%
,C. |1'
D. |1" |- |CORRECT |ANSWER✔✔-B. |1%
A |power |line |is |rated |330kv, |the |closest |a |crane |with |150' |boom |can |get |without |a |spotter |is?
A. |200'
B. |20'
C. |170'
D. |50' |- |CORRECT |ANSWER✔✔-C. |170'
ASME |recommends, |when |hoisting |personnel, |line |speeds |of
A. |No |more |than |100 |f/m
B. |No |more |than |necessary
C. |No |more |than |100 |f/s
D. |No |speed |recommendation |- |CORRECT |ANSWER✔✔-A. |No |more |than |100 |f/m
Rigging, |custom |hooks, |clamps, |spreader |beams, |etc. |Shall |be |proof |tested |to |______ |of |
capacity |
A. |100%
B. |125%
C. |110%
D. |115% |- |CORRECT |ANSWER✔✔-B. |125%
Blocking |under |outrigger |pads |should |be |what |size?
, A. |Equal |to |the |pad
B. |Three |times |larger |than |the |pad
C. |Smaller |than |the |pad
D. |Five |times |larger |than |the |pad |- |CORRECT |ANSWER✔✔-B. |Three |times |larger |than |the |pad
When |a |crane |is |out |of |level, |the |capacity |reduction |is |greatest |in |which |configuration?
A. |Short |boom, |minimum |radius
B. |Long |boom, |maximum |radius
C. |Short |boom, |maximum |radius
D. |Long |boom, |minimum |radius |- |CORRECT |ANSWER✔✔-D. |Long |boom, |Minimum |radius
The |crane's |anti-two |block |stopped |working. |Per |OSHA, |how |soon |must |it |be |repaired?
A. |Immediately
B. |Within |30 |days
C. |Before |end |of |shift
D. |Within |7 |days |- |CORRECT |ANSWER✔✔-D. |Within |7 |days
Which |is |the |OSHA |criteria |for |removing |running |rope?
A. |Six |random |broken |wires |in |one |lay |or |three |broken |wires |in |one |strand |in |one |lay
B. |2 |random |broken |wires |in |6 |diameters |or |4 |in |30 |diameters
C. |3 |random |broken |wires |in |6 |diameters |or |in |6 |in |12 |diameters