Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 131 pages
Exam (elaborations)

Solution and Answer Guide Electrical Wiring Commercial 18th Edition by Phil Simmons, Ray C. Mullin, Mark Ode

Document preview thumbnail
Preview 4 out of 131 pages

Solution and Answer Guide Electrical Wiring Commercial 18th Edition by Phil Simmons, Ray C. Mullin, Mark Ode

Content preview

RRRR




Solution and Answer Guide Electrical Wiring

Commercial 18th Edition by Phil Simmons, Ray C.

Mullin, Mark Ode

Prose1 Stuvia
THIS DOCUMENT CONTAINS:

** Solution manual


** Solution and Answer Guide


** Electrical Wiring Commercial 18th Edition


** by Phil Simmons, Ray C. Mullin, Mark Ode

, Solutions Manual for Electrical Wiring Commercial
18th Edition by Phil Simmons A+

Solution and Answer Guide
SIMMONS/ODE, ELECTRICAL WIRING COMMERCIAL, 18E © 2024, 9780357767115;
CHAPTER 1:COMMERCIAL BUILDING PLANS AND SPECIFICATIONS


TABLE OF CONTENTS
Review .......................................................................................................................................................... 1



Note to instructor: It is recommended that students be required to respond, where
appropriate, with answers that are complete sentences.


REVIEW

Refer to the National Electrical Code or the working drawings when necessary. Where
applicable, responses should be written in complete sentences.
1. What section of a commercial building’s specification contains a list of contract
documents?
Answer: A list of the contract documents is contained in General Clauses and Conditions. A
listing of the Commercial Building contract documents is presented in this chapter under the
heading “Commercial Building Plans.” The instructor may wish to have the students check over
this listing and compare it with the plans provided.
2. The requirement for temporary light and power at the job site will be found in what
portion of a commercial building’s specification?
Answer: The Supplementary General Conditions specifies the job site requirements for
temporary light and power. In some contracts, this electrical system becomes the responsibility
of the general contractor; in other contracts, it is the electrical contractor’s responsibility to
install and maintain the temporary electrical system. The instructor may wish to refer the student
to NEC Article 590 and discuss the requirements in detail.


A+ Page 1

,3. The electrician uses the Schedule of Working Drawings for what purpose?
Answer: The electrician uses the Schedule of Working Drawings to determine whether all of the
drawings are at hand. The information on “the other sheets” may be very important, especially in
coordinating with other contractors.
4. Complete the following items by indicating the letter(s) designating the correct source(s)
of information:
No. Answer Item Information

4. Sections Ceiling height Sections, Sheet A6

5. Electrical Electrical receptacle Electrical symbol schedule, Chapter
symbol style 2,Figure 2–6
schedule

6. Electrical Electrical outlet Electrical layout drawings, Sheets
layout location El,E2, and E3
drawings

7. Elevations Exterior wall finishes Elevations, Sheets A4 and A5

8. Site plan Grading elevations Site plan, Sheet A4

9. Electrical Panelboard schedules Electrical layout drawings, Sheet E4
layout
drawings

10. Architectural Room width Architectural floor plan, Sheets Al,
floor plan A2,and A3

11. Architectural Swing of door Architectural floor plan, Sheets Al,
floor plan A2,and A3

12. Sections View of interior wall Sections, Sheet A6



A+ Page 2

, Match the items on the left with those on the right by writing the letter
designation ofthe appropriate organization from the list on the right.


13. NEC Electrical Code National Electrical Code (NEC)

14. IAEI Electrical inspectors International Association of
ElectricalInspectors (IAEI)


15. NFPA Fire codes National Fire Protection Association
(NFPA)

16. IESNA Lighting information Illuminating Engineering
Society ofNorth America
(IESNA)

17. UL Listing service Underwriters Laboratories, Inc.
(UL)

18. NEMA Manufacturers’ National Electrical
standards ManufacturersAssociation
(NEMA)

19. PE Seal Professional Engineer (PE)


Match the items on the left with those on the right by writing the letter
designation ofthe proper level of NEC interpretation from the list on the
right.


20. with Allowed by the Code Shall be permitted, or Shall not
special berequired, NEC
permission

21. with May be done Shall be permitted, or Shall not



A+ Page 3

Connected book
 image
Phil Simmons, Ray C. Mullin, Mark Ode Electrical Wiring Commercial
Publisher: 2023 ISBN: 9780357767108 Edition: Unknown

Document information

Uploaded on
November 11, 2025
Number of pages
131
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$18.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Prose1
4.4
(326)
Sold
823
Followers
75
Items
6824
Last sold
6 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions