Existing Veg, Desc/Purp
temp or perm bmp desi to stab soil and remove sups part from sheet flow runoff.
Existing Veg, Objectives
1) Site Plan and Mang
2) Erosi Cont
3) Sedi Cont
4) Post-Cons Mang
Existing Veg, applic
1) Areas within site where no const activity is occur
2) Areas where local, state and fed govt require preservation
3) Areas where existing veg can be utilized for eros, sedi, and storm water quality.
Existing veg: inspection
1) Accord to regu timetables
2) erosi and damage veg
3) sufficient moisture to ensure growth
4) veg is well stab
, CESSWI Exam Part 2 | Questions & correct
Answers| Latest 2026/ 2027 Update | Grade A
(100% Correct) Verified Elaborations
5) adequate cover
6) debris and litter
7) invasive exotics
Existing veg: maint
1) only disturb area for construct
2)irrigate dry seasons
3) remove see, and replant if need be
4) replant or rework buffer strips
5) mow and cut perennial weeds
6) remove all trash and debri
7) treat invasive and noxious species
Sched/Sequ, purp/descrip
Temp, procedural control that involves creating a written plan to address neck bmps and
sequencing of construct activities to mitigate the erosive effects of wind,water and construct
activities.
Sched/Sequ: object
1) site planning & management
2) erosion control
3) sediment control
, CESSWI Exam Part 2 | Questions & correct
Answers| Latest 2026/ 2027 Update | Grade A
(100% Correct) Verified Elaborations
Sched/Sequ: applications
1) develop timetables for certain activities, paretic during rainy season
Sched/Sequ: inspect
1) inclusion of sched/seq as a bmp in the plan
2) ached site activities mirroring ached activites.
Sched/Sequ: maintanence
1) modify ached of active when changes are warranted
2) modify ached of active prior to rainy season to reflect updated bmp info
Hydroseed: Des& purp
Temp or perm bmp designed to reduce erosion and runoff by applying mix of seed, fert and
stabilizing emulsion.
Hydroseed: object
1) erosion control
2) good housekeeping/ materials management
3) post construct management
, CESSWI Exam Part 2 | Questions & correct
Answers| Latest 2026/ 2027 Update | Grade A
(100% Correct) Verified Elaborations
Hydroseed: targeted pollut
1) sediment
2) nutrients
3) metals
4) ph
Hydroseed: imp consid
1) need adequate moisture
2) additional mulch may be added
3) pretreatment where cover is not met
4) apply from multi angles to avoid shadowing
Hydroseed: limitations
1) seed mix approp for seasonal conditions
2) time of application per seasonal conditions
3) difficult on steep slopes
4) no pedestrian or vehicle traffic
5) avoid high winds
Answers| Latest 2026/ 2027 Update | Grade A
(100% Correct) Verified Elaborations
Existing Veg, Desc/Purp
temp or perm bmp desi to stab soil and remove sups part from sheet flow runoff.
Existing Veg, Objectives
1) Site Plan and Mang
2) Erosi Cont
3) Sedi Cont
4) Post-Cons Mang
Existing Veg, applic
1) Areas within site where no const activity is occur
2) Areas where local, state and fed govt require preservation
3) Areas where existing veg can be utilized for eros, sedi, and storm water quality.
Existing veg: inspection
1) Accord to regu timetables
2) erosi and damage veg
3) sufficient moisture to ensure growth
4) veg is well stab
, CESSWI Exam Part 2 | Questions & correct
Answers| Latest 2026/ 2027 Update | Grade A
(100% Correct) Verified Elaborations
5) adequate cover
6) debris and litter
7) invasive exotics
Existing veg: maint
1) only disturb area for construct
2)irrigate dry seasons
3) remove see, and replant if need be
4) replant or rework buffer strips
5) mow and cut perennial weeds
6) remove all trash and debri
7) treat invasive and noxious species
Sched/Sequ, purp/descrip
Temp, procedural control that involves creating a written plan to address neck bmps and
sequencing of construct activities to mitigate the erosive effects of wind,water and construct
activities.
Sched/Sequ: object
1) site planning & management
2) erosion control
3) sediment control
, CESSWI Exam Part 2 | Questions & correct
Answers| Latest 2026/ 2027 Update | Grade A
(100% Correct) Verified Elaborations
Sched/Sequ: applications
1) develop timetables for certain activities, paretic during rainy season
Sched/Sequ: inspect
1) inclusion of sched/seq as a bmp in the plan
2) ached site activities mirroring ached activites.
Sched/Sequ: maintanence
1) modify ached of active when changes are warranted
2) modify ached of active prior to rainy season to reflect updated bmp info
Hydroseed: Des& purp
Temp or perm bmp designed to reduce erosion and runoff by applying mix of seed, fert and
stabilizing emulsion.
Hydroseed: object
1) erosion control
2) good housekeeping/ materials management
3) post construct management
, CESSWI Exam Part 2 | Questions & correct
Answers| Latest 2026/ 2027 Update | Grade A
(100% Correct) Verified Elaborations
Hydroseed: targeted pollut
1) sediment
2) nutrients
3) metals
4) ph
Hydroseed: imp consid
1) need adequate moisture
2) additional mulch may be added
3) pretreatment where cover is not met
4) apply from multi angles to avoid shadowing
Hydroseed: limitations
1) seed mix approp for seasonal conditions
2) time of application per seasonal conditions
3) difficult on steep slopes
4) no pedestrian or vehicle traffic
5) avoid high winds