Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

[Solved] IFSM 438 Tiger Team FINAL (Consolidated Project Management Plan)

Beoordeling
-
Verkocht
-
Pagina's
18
Cijfer
A+
Geüpload op
23-01-2021
Geschreven in
2020/2021

[Solved] IFSM 438 Tiger Team FINAL (Consolidated Project Management Plan)

Instelling
Vak

Voorbeeld van de inhoud

Team 5, "Tiger Team"
Project Management Plan
IFSM 438: Project Management
ITP-6 (Consolidated Project Management Plan)




Andrew Shaw Team Lead, Submitter and Configuration Manager
Tommy Mata Facilitator
Christopher Schultz Editor
Oluwadamilare Ogunlade Documentation Manager and Deputy Team Lead
Tiara Richardson Research




Contents
Executive Summary.........................................................................................................................1
Integration Management..................................................................................................................2
Roles and Responsibilities...........................................................................................................2
Change and control management.................................................................................................3
Scope Management..........................................................................................................................4

, Goals & Objectives......................................................................................................................4
Project scope................................................................................................................................5
Major Deliverables.......................................................................................................................6
Project Constraints/Assumptions.................................................................................................7
Project Dependencies...................................................................................................................7
WBS.............................................................................................................................................8
Schedule Management.....................................................................................................................9
Milestones....................................................................................................................................9
Work Plan...................................................................................................................................10
Cost Management..........................................................................................................................10
Resource Estimates....................................................................................................................10
Cost to Benefit Assessment........................................................................................................12
Risk Assessment.........................................................................................................................12
Quality Management......................................................................................................................13
Quality Control...........................................................................................................................13
Standards....................................................................................................................................13
Tools & Techniques...................................................................................................................14
Project Contact Directory..............................................................................................................14
Changes in project documentation from original versions............................................................15
Appendices.....................................................................................................................................16
APPENDIX A: Approval sign-off form.....................................................................................16
APPENDIX B: Document References.......................................................................................16
References......................................................................................................................................17



Executive Summary

Dental office owners, Dr. Bob and his son Dr. Robert Jr. have recently been offered the

opportunity to expand their current practice to a nearby office that will more than double the

workspace. Their business has never utilized any IT system for processes and does not have any

infrastructure in place to expound on. The project is to plan an installation of a comprehensive

Page 1 of 18
Plan Template Reference (Project Management Plan, 2017)

, IT solution that will facilitate the business needs of the Marley Dental Clinic. The major purpose

for this project is to provide an IT system that will be modern and will make the practice more

efficient (Integrated Team, n.d.).

Several IT systems will be configured to support the business operations at Marley Dental

Clinic. A comprehensive ERP system will be implemented to facilitate automatic appointment

booking, billing, purchasing, and sales. Additionally, IT system and network infrastructure

equipment will be configured to support the needs of the business and the end users (i.e. dentists,

dental assistants, receptionist, bookkeeper, etc.).

The steps to get this project underway would be first to bring the project team together that

will design and execute the project. These team members will also get with Dr. Bob and his son

Dr. Robert Jr. to align the requirements and scope of the project. This will bring everyone

together working for the same goal on this project. Then the team will develop a charter,

preliminary schedules and a budget. These documents are to ensure all stakeholders agree on

what is needed in this project, how the project will be ran and monitored to stay on schedule and

how much it is projected to cost.




Integration Management
Roles and Responsibilities

Stakeholder(s) Role
Dr. Bob Key stakeholder, project customer

Dr. Robert Jr. Key stakeholder, project customer




Page 2 of 18
Plan Template Reference (Project Management Plan, 2017)

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
23 januari 2021
Aantal pagina's
18
Geschreven in
2020/2021
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$14.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
StuviaGuides West Virgina University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
16217
Lid sinds
7 jaar
Aantal volgers
8363
Documenten
5980
Laatst verkocht
3 uur geleden
Accounting, Finance, Statistics, Computer Science, Nursing, Chemistry, Biology & More — A+ Test Banks, Study Guides & Solutions

As a Top 1st Seller on Stuvia and a nursing professional, my mission is to be your light in the dark during nursing school and beyond. I know how stressful exams and assignments can be, which is why I’ve created clear, reliable, and well-structured resources to help you succeed. I offer test banks, study guides, and solution manuals for all subjects — including specialized test banks and solution manuals for business books. My materials have already supported countless students in achieving higher grades, and I want them to be the guide that makes your academic journey easier too. I’m passionate, approachable, and always focused on quality — because I believe every student deserves the chance to excel.

Lees meer Lees minder
4.3

2295 beoordelingen

5
1571
4
305
3
184
2
74
1
161

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen