AND CORRECT ANSWERS (PROFESSOR VERIFIED) |
ALREADY GRADED A+
What is the input voltage range of the Doorbell Cam? - CORRECT ANSWER -12-24v
What is the output voltage of the transformer used to power the SkyControl panel? - CORRECT
ANSWER -16.5 VAC
True or False: When programming a sensor into the sky panel you can type in the serial number
or "learn" it in by triggering the device - CORRECT ANSWER -true
When programming a DW21, which loop number is used?
1
2
3 - CORRECT ANSWER -2
Which of the following materials can you use to group multiple ground terminals in a takeover
module:
Solder
String
Wire Caps
Duct Tape
Beans - CORRECT ANSWER -beans and wire caps
T or F: When installing the firefighter, it is required to test the customer's existing smoke
detectors - CORRECT ANSWER -True
, When installing a DW21, what size bit should you use to drill the hole for the sensor?
1/2"
3/8"
3/4"
1" - CORRECT ANSWER -3/4"
T or F: When installing the TAKE-345, you must ensure that the transformer is supplying power
to the power supply before the battery. - CORRECT ANSWER -True
T or F: You are required to test signals from all secondary keypads and key fobs even though
they are not detection devices - CORRECT ANSWER -True
T or F: When running power to the TAKE-345 polarity does not apply - CORRECT ANSWER -
False
What is the correct height at which to install the PIR2?
7 ft
At least 5 ft
At least 7 ft
At 7.5 ft - CORRECT ANSWER -
- CORRECT ANSWER -How would you program a CO3 if mounted on a hallway wall?
Loop 1 Zone 8
Loop 1 Zone 14
Loop 3 Zone 4
Loop 1 Zone 4