VA DEQ ESC Inspector Exam Question & Answers

Institution
Missouri Life Insurance Exa Question & Answer (
Course
Missouri Life Insurance Exa Question & Answer (











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Missouri Life Insurance Exa Question & Answer (
Course
Missouri Life Insurance Exa Question & Answer (

Document information

Uploaded on
October 30, 2025
Number of pages
53
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

VA DEQ ESC Inspector Exam Question
& Answers 2025
VESCP - CORRECT ANSWERS ✔✔Virginia Erosion and
Sediment Control Program


- Administered by counties/cities (must), towns (may)
- MUST BE APPROVED


Minimum Standard 1 - CORRECT ANSWERS
✔✔Stabilization


permanent or temporary soil stabilization shall be applied
to denuded areas within seven days after final grade is
reached on any portion of the site; temporary soil
stabilization shall be applied within seven days to
denuded areas that may not be at final grade but will
remain dormant for longer than 14 days; permanent
stabilization shall be applied to areas that are to be left
dormant for more than one year


Site NOT at Final Grade - CORRECT ANSWERS ✔✔-
stabilize in 14 days
- temporarily seed
- mulch
- permanently stabilize if dormant > 1 year

,VA DEQ ESC Inspector Exam Question
& Answers 2025

Site at Final Grade - CORRECT ANSWERS ✔✔-
stabilize in 7 days (recommended immediately)
- permanently or temporarily seed and mulch
- mulch/matting/straw


Minimum Standard 2 - CORRECT ANSWERS ✔✔Stock
Piles, Waste and Borrow Areas


during construction, soil stock piles and borrow areas
shall be stabilized or protected with sediment trapping
measures


mulch prevents erosion by protecting the surface from
raindrop impact and silt fence intercepts and detains from
disturbed areas


Minimum Standard 3 - CORRECT ANSWERS
✔✔Permanent Vegetation


permanent vegetation cover shall be established on
denuded areas not otherwise permanently stabilized
(permanent vegetation shall not be considered

,VA DEQ ESC Inspector Exam Question
& Answers 2025
established until a ground cover is achieved that is
uniform, mature enough to survive, and will inhibit
erosion *there is no % associated with this*)


reduce erosion and decrease sediment yield from
disturbed area


this is the standard used to verify that a site is ready for
release of bonds or surety


Minimum Standard 4 - CORRECT ANSWERS ✔✔First-
Step Measures


Sediment basins and traps, perimeter dikes, sediment
barriers and other measures intended to trap sediment
shall be constructed as a first step in any land-disturbing
activity and shall be made functional before upslope land
disturbance takes place


a certain amount of initial land disturbance may be
required to provide access for equipment to install the
perimeter controls, but site clearing and grading should
be kept to a minimum until the perimeter controls are in
place

, VA DEQ ESC Inspector Exam Question
& Answers 2025

intercepts and detains small amounts of sediment from
disturbed areas during construction operation to prevent
sediment from leaving the site and decrease velocity of
sheet flows and low-to-moderate level channel flow


Perimeter Controls - CORRECT ANSWERS ✔✔assures
that sediment does not leave the perimeter of the land-
disturbing area once site clearing, grading, and
construction commences


Examples: silt fences, sediment traps, sediment basins,
construction entrance, temporary diversions, diversions


Minimum Standard 5 - CORRECT ANSWERS
✔✔Earthen Structure Stabilization


stabilization measures shall be applied to earthen
structures such as dams, dikes, and diversions
immediately after installation


reduce erosion and sedimentation and reduce damage
from sediment and runoff to downstream or off-site areas

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NatashaKate Florida A&M University
View profile
Follow You need to be logged in order to follow users or courses
Sold
16
Member since
1 year
Number of followers
0
Documents
2599
Last sold
4 weeks ago
Natashakate

1.0

1 reviews

5
0
4
0
3
0
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions