1
For Expert help and assignment solutions, +254707240657
Home Improvement Questions and
Answers (100% Correct Answers) Already
Graded A+
height [ Ans: ] difference between a crawlspace and a
basement
sill plate [ Ans: ] Wood above the foundation and below the
floor joist
© 2025 Assignment Expert
spacing on floor joists [ Ans: ] 16 inches on center
girder [ Ans: ] main beam that runs perpendicular to the floor
structure and supports the structure
Guru01 - Stuvia
3 4 5 rt [ Ans: ] used to determine if a floor box is square
thickness of plywood we use on sub floor [ Ans: ] 3/4 of an inch
foundations [ Ans: ] can be poured concrete or block
crawlspace [ Ans: ] Structure best used on a waterfront property
floor joist [ Ans: ] horizontal beams a run from foundation walls
folding [ Ans: ] support at the base of the foundation wall
studs [ Ans: ] vertical wall supports
16" on center [ Ans: ] spacing between studs
sheathing [ Ans: ] plywood use on the exterior of the structure
tar paper or vapor barrier's [ Ans: ] apply to a wall to prevent
water damage
well framed wall [ Ans: ] Will be both square and plumb
2 x 4 [ Ans: ] dimensions of a typical wall stud
blocking [ Ans: ] small sections are 2 x 4 that are placed
between studs at wall intersections
For Expert help and assignment solutions, +254707240657
Home Improvement Questions and
Answers (100% Correct Answers) Already
Graded A+
height [ Ans: ] difference between a crawlspace and a
basement
sill plate [ Ans: ] Wood above the foundation and below the
floor joist
© 2025 Assignment Expert
spacing on floor joists [ Ans: ] 16 inches on center
girder [ Ans: ] main beam that runs perpendicular to the floor
structure and supports the structure
Guru01 - Stuvia
3 4 5 rt [ Ans: ] used to determine if a floor box is square
thickness of plywood we use on sub floor [ Ans: ] 3/4 of an inch
foundations [ Ans: ] can be poured concrete or block
crawlspace [ Ans: ] Structure best used on a waterfront property
floor joist [ Ans: ] horizontal beams a run from foundation walls
folding [ Ans: ] support at the base of the foundation wall
studs [ Ans: ] vertical wall supports
16" on center [ Ans: ] spacing between studs
sheathing [ Ans: ] plywood use on the exterior of the structure
tar paper or vapor barrier's [ Ans: ] apply to a wall to prevent
water damage
well framed wall [ Ans: ] Will be both square and plumb
2 x 4 [ Ans: ] dimensions of a typical wall stud
blocking [ Ans: ] small sections are 2 x 4 that are placed
between studs at wall intersections