100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

ECON-B 252 EXAM 1 QUESTIONS & ANSWERS

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
19-10-2025
Written in
2025/2026

ECON-B 252 EXAM 1 QUESTIONS & ANSWERS

Institution
ECON 252
Course
ECON 252









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ECON 252
Course
ECON 252

Document information

Uploaded on
October 19, 2025
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CON 367 EXAM 1-2 QUESTIONS + ANSWERS

Professional CM (Agency CM) - Answer -Which one of the following is not a Project
Delivery System?

In lump-sum contracts, the Owner assumes the risk of cost. - Answer -False

Typically, the Design Reviewer has the ultimate responsibility and authority to make
executive decisions related to matters affecting time and money in a construction
project. - Answer -False

In the Design-Build project delivery system, the Owner has separate contracts with the
Designer and the Contractor. - Answer -False


Shop drawings can be used as change orders. - Answer -False

Which one of the following is not an element of the Contract as we discussed in class? -
Answer -(Promise)
Offer
Acceptance
Consideration

Which of the following is not a condition where a contract will not be enforced by courts?
- Answer -Seniority

Fill in the blank in the following statement: Some contracts must be in writing under the
____________ as adopted by each state. - Answer -Statute of Frauds

RFI (Request for Information) is the document that is transmitted to the General
Contractor from the Designer to get clarifications with respect to design drawings and
specifications. - Answer -False

The resident project representative should not supervise, direct, or control the
contractor's means and methods of performing work. - Answer -True

In fast-track projects with multiple contractors, the services of a professional
construction management firm (Agency CM) are essential. - Answer -True

A professional construction management firm (Agency CM) can participate in the
following phases of a project: - Answer -Conception, Program Planning, Design,
Construction, and Closeout

The design-build process may face some legal barriers when tried to be implemented in
the public sector. - Answer -True

, On a multiple-prime project, the owner is responsible for coordinating the various trade
contractors with whom it has contracted. - Answer -True

According to the brief article (in the supplemental reading for Week 3) about the use of
Web-based project management system used in Illinois Tollway, such system resulted
in reduced turnaround time on communications and improved access to project
paperwork. - Answer -True

The Resident Project Representative does not need to make any measurement for the
progress payments in the lump-sum projects. - Answer -False

Use of Building Information Modeling (BIM) in construction projects may result in a
reduction in Requests for Information (RFIs) and change orders. - Answer -True

The specifications should contain absolute dimensions and avoid tolerances in those
dimensions. - Answer -False

The Resident Project Representative should stop the work of the Contractor when the
work is not performed according to the drawings and specifications. - Answer -False

Which of the following should not be performed by the Resident Project Representative
for inspections? - Answer -Providing instructions directly to subcontractors

Which of the following is not true for the construction diary? - Answer -Entries should
be made on a weekly basis (i.e., at the end of each week)

Ambiguous language in a contract is interpreted against the party who selected the
language or supplied the contract. - Answer -True

According to Spearin Doctrine, when the contractor exactly follows the detail
specifications and drawings, she/he will not be responsible for unsatisfactory results in
the end product. - Answer –True

Fair subcontracting laws are in effect to protect subcontractors and the public against
bid shopping and bid peddling practices. - Answer -True

The Americans with Disabilities Act (ADA) of 1990 is enforced by: - Answer -Equal
Employment Opportunity Commission (EEOC)

Put in chronological order (from 1 to 5) the following 5 steps of the process of initiating a
construction project. - Answer -1. Advertise for bids
2. Open bids
3. Award contract
4. Sign the contract
5. Issue Notice to Proceed

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA YALA UNIVERSITY
View profile
Follow You need to be logged in order to follow users or courses
Sold
2015
Member since
3 year
Number of followers
1447
Documents
48861
Last sold
1 day ago

3.8

345 reviews

5
172
4
61
3
44
2
16
1
52

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions