answers
The lean ratio of an extension ladder - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
✔✔4:1
According to a Hera, to complete a response action of a non-
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
NESHAP size project how many samples must be taken with
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
results of what? - CORRECT ANSWERS ✔✔5 samples taken inside
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
with results of each 0.0 f/cc
|\ |\ |\ |\ |\
What are the notification requirements in Virginia? - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔20 calendar days for any project greater than 10
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
ft.² or linear feet
|\ |\ |\
In what US jurisdiction do individuals need an asbestos
|\ |\ |\ |\ |\ |\ |\ |\ |\
supervisor or working license? - CORRECT ANSWERS ✔✔Need a |\ |\ |\ |\ |\ |\ |\ |\ |\
license everywhere |\
Type of bond that would ensure that the general contractor will
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
compensate sub contractors for labor and materials? - CORRECT |\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔Performance bond |\ |\
Minimum respiratory protection on a class one asbestos project
|\ |\ |\ |\ |\ |\ |\ |\ |\
with no NEA? - CORRECT ANSWERS ✔✔Full face air, purifying
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
respirator
, What is the maximum content permitted in the work area where
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
an air purifying respirator is being worn? - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
✔✔23.5%
Xrays must be evaluated by what class reader? - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔Class B |\ |\
What is the APF for a full face air purifying respirator? - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔50
|\ |\
Friable ACM is it any material that can be? - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
✔✔Crash pulverized, reduced to powder by hand pressure when
|\ |\ |\ |\ |\ |\ |\ |\ |\
dry
The OSHA permissible exposure limit is? - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\ |\
✔✔0.1 f/CV over 8 hours TWA |\ |\ |\ |\ |\
According to ASHERA how many air samples must be taken to
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
final clearance for NEAHAP size project? - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\ |\
✔✔13 samples Dash five inside, five outside, two field blanks,
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
one sealed blank, TEM
|\ |\ |\
Laboratories that perform PLM and TEM must be accredited by? - |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔National voluntary laboratory
|\ |\ |\ |\ |\
accreditation program |\
AHERA is for? - CORRECT ANSWERS ✔✔Schools public K -12
|\ |\ |\ |\ |\ |\ |\ |\ |\