MISY 5340 - Ch. 6 Key Terms
Back flushing - answer A technique that automatically records the goods issue when the
order is confirmed.
Thus, the materials issued are NOT recorded at the time they are withdrawn from
inventory.
Bill of materials (BOM) - answer Identifies the components that are necessary to
produce a material.
One of the three primary inputs of MRP; a listing of all of the raw materials and semi
finished goods (parts, subassemblies, and assemblies) needed to produce one unit of a
product.
Capacity splits - answer Used to determine how the work to be performed is distributed
or split among the machines and/or people involved in producing the material.
Component assignment - answer A technique that assigns components in a BOM either
to a routing or to a specific operation within the routing.
Confirmation - answer Indicates how much work was completed, where it was
completed (work center), and who completed it.
Ex: Time event, ticket, collective, fast entry, milestone, and progress confirmations.
Goods issue - answerMaterials or components are issued to the production order from
storage.
The trigger is the release of the production order.
Goods receipt - answerRecords the receipt of materials into storage, which results in an
increase in inventory quantity.
Item category - answerIdentifies the type of material and influences how the material is
to be used in the BOM.
Make-to-order - answerProduction is triggered by the need to fill a specific customer
order.
A system that produces low volumes of customized product.
Back flushing - answer A technique that automatically records the goods issue when the
order is confirmed.
Thus, the materials issued are NOT recorded at the time they are withdrawn from
inventory.
Bill of materials (BOM) - answer Identifies the components that are necessary to
produce a material.
One of the three primary inputs of MRP; a listing of all of the raw materials and semi
finished goods (parts, subassemblies, and assemblies) needed to produce one unit of a
product.
Capacity splits - answer Used to determine how the work to be performed is distributed
or split among the machines and/or people involved in producing the material.
Component assignment - answer A technique that assigns components in a BOM either
to a routing or to a specific operation within the routing.
Confirmation - answer Indicates how much work was completed, where it was
completed (work center), and who completed it.
Ex: Time event, ticket, collective, fast entry, milestone, and progress confirmations.
Goods issue - answerMaterials or components are issued to the production order from
storage.
The trigger is the release of the production order.
Goods receipt - answerRecords the receipt of materials into storage, which results in an
increase in inventory quantity.
Item category - answerIdentifies the type of material and influences how the material is
to be used in the BOM.
Make-to-order - answerProduction is triggered by the need to fill a specific customer
order.
A system that produces low volumes of customized product.