Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

SWPPP Test Comprehensive Questions with Verified Answers Graded A+

Document preview thumbnail
Preview 2 out of 8 pages

SWPPP Test Comprehensive Questions with Verified Answers Graded A+

Content preview

SWPPP Test Comprehensive
Questions with Verified
Answers Graded A+
The law that set into place stormwater regulations in the 1970s is - Answer: The Clean Water
Act



Regulations for managing stormwater activity on a construction site are outlined in the -
Answer: NPDES



When should you read and understand your project stormwater pollution prevention plan -
Answer: Immediately after the project awarded and before you begin any site work is



Which of the following is not an allowable stormwater discharge or non-stormwater discharge -
Answer: Discharges are contaminated groundwater



Construction activity may begin - Answer: When the jurisdiction of operation specifies you can
start



Waters that sell anti-degration standards are placed on the _______ list - Answer: 303D



SWPP certifications are signed by - Answer: An officer of the project owner or an officer of the
general contractor.

, TRUE OR FALSE: The document that must be completed signed and submitted to the state to
obtain authorization to discharge is the NOT - Answer: False



The notice of termination can be filed when - Answer: All construction inside and outside of the
building is completed and the final stabilization has been verified as complete



Operators on a construction site are the entity in charge of plans and specifications and the
entity who is - Answer: Is in charge of daily activities



You should have a SWPPP for your construction site because (3 reasons) - Answer: 1. Its
documents stormwater management

2. Demonstrates your intent to manage stormwater on your site

3. It is required by law



A well constructed SWPPP for your site should be - Answer: Site specific



The NO must be submitted - Answer: Prior to you commencing construction



One necessary component of a good SWPPP is - Answer: A schedule of activities



Factors that may impact the SWPPP scheduling activities include - Answer: Weather and climate



Pollutant sources on a construction site may include (3) - Answer: 1. petroleum storage tanks

2. Masonry material

3. soil amendment



The following considerations may be incorporatedd into SWPPP - Answer: Endangered species
and historical preservation

Document information

Uploaded on
October 8, 2025
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
YourExamplug
4.2
(70)
Sold
213
Followers
27
Items
17589
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions