Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Construction Management Practice Test/ Construction Management Final Exam With complete solution Rated a+ 2025/2026 NEW!!

Beoordeling
-
Verkocht
-
Pagina's
34
Cijfer
A+
Geüpload op
07-10-2025
Geschreven in
2025/2026

Construction Management Practice Test/ Construction Management Final Exam With complete solution Rated a+ 2025/2026 NEW!!Construction Management Practice Test/ Construction Management Final Exam With complete solution Rated a+ 2025/2026 NEW!!Construction Management Practice Test/ Construction Management Final Exam With complete solution Rated a+ 2025/2026 NEW!!Construction Management Practice Test/ Construction Management Final Exam With complete solution Rated a+ 2025/2026 NEW!!Construction Management Practice Test/ Construction Management Final Exam With complete solution Rated a+ 2025/2026 NEW!!Construction Management Practice Test/ Construction Management Final Exam With complete solution Rated a+ 2025/2026 NEW!!

Meer zien Lees minder
Instelling
Construction Management
Vak
Construction Management

Voorbeeld van de inhoud

Construc on Management Prac ce Test/ Construc on
Management Final Exam With complete solu on Rated
a+ 2025/2026 NEW!!

Based on the guide quan ty of 100 CY on a bid document for rock excava on, a contractor bid a
unit price of $20/CY. If the owner's representa ve determined that the contractor excavated 85
CY of rock during construc on, how much will the contractor get paid?

(a). $2000

(b). $1700

(c). $300

(d). $1800 - Ans (b)



Which of the following documents are included in the bid package?

I. Proposal Form

II. Special Condi ons

III. Technical Specifica ons

IV. General Condi ons

V. Bid Bond

(a). I, II, and III

(b). II, III, and IV

(c). I, II, IV, and V

(d). I, II, III, and IV - Ans (d)



The document requested by the owner as a protec on against the risk of the contractor not
accep ng the job once awarded the project is

(a). Insurance

,(b). Performance Bond

(c). Bid Bond

(d). Payment Bond - Ans (c)



Which of the following would not be considered an excusable delay?

(a). Labor Strikes

(b). Review process delays

(c). A hurricane closing a port delaying delivery of materials

(d). Death of a contractor - Ans (b)



The typically 30-90 days period a=er the bid opening where the contractor is bound by their bid
is called

(a). Acceptance period

(b). Bid period

(c). Anxiety period

(d). Risk period - Ans (a)



The procedure that allows a contractor to propose changes to the design with the approval of
the designer to save me and/or money is called

(a). Process Engineering

(b). Value Engineering

(c). Design build engineering

(d). Cost engineering - Ans (b)



Which of the following documents determines the zero day of the project for scheduling
purposes?

(a). Proposal Form

,(b). Formal contract

(c). No ce to bidders

(d). No ce to proceed - Ans (d)



The amount held back from the payments to give the contractor an incen ve to finish the job
on me is called

(a). Retainage

(b). Escrow

(c). Progress Payment

(d). Liquidated damages - Ans (a)



Which of the following types of contracts require the contractor to carry the risk of increased
costs

(a). Cost + %fee

(b). Cost + fixed fee

(c). Target price with profit sharing

(d). GMP - Ans (d)



Which of the following is included in a lump sum bid price?

(a). Direct cost of construc on

(b). Indirect costs of construc on

(c). change orders

(d). Home office overhead - Ans (a), (b), (d)



Which of the following are NOT true for design bid build project delivery system?

I. Lowest responsible price is used

II. Phased construc on is possible

, III. Contractor carries most of risk

IV. Designers have access to contractor's exper se



(a). I and IV

(b). II and IV

(c). II and III

(d). II, III, and IV - Ans (b).



Why may a mobiliza on payment by the owner decrease the financing cost of a project?

(a). Typically the owner's cost of borrowing money is lower compared to the contractor

(b). due to increased value of an earlier payment

(c). Because of infla on

(d). Delayed payments won't have to be paid back. - Ans (a)



Which of the following delivery methods allow contractor's input during the design phase?

I. CM @ Risk

II. DBB

III. DB

IV. CM Agency



(a). I and III

(b).I, II, and IV

(c). I, III, and IV

(d). II, III, and IV - Ans (c)



Which of the following are NOT an aIribute of a Partnership

Geschreven voor

Instelling
Construction Management
Vak
Construction Management

Documentinformatie

Geüpload op
7 oktober 2025
Aantal pagina's
34
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$11.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kan je een ander document kiezen. Je kan het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
STUVEX NURSING
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
778
Lid sinds
2 jaar
Aantal volgers
313
Documenten
15761
Laatst verkocht
6 dagen geleden
STUVATE - STUVIA USA

My store is a comprehensive destination for buying and selling a variety of documents. we offer a vast range of documents that cater to different needs and requirements, our documents are well-researched, accurate, and of high quality, ensuring customer satisfaction. whether you are looking for legal documents, academic papers, business reports or miscellaneous documents we`ve got you covered.

3.8

122 beoordelingen

5
47
4
32
3
24
2
7
1
12

Populaire documenten

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen