SAFe Scrum Master Practice Test
Study online at https://quizlet.com/_huj2fu
1. what is an anti-pattern for the IP iteration?
- to plan work for the IP iteration during PI planning
- to allow for sufficient capacity in the program roadmap
- to ensure all stories and teams' PI plans are completed prior to the IP iteration
- to minimize lost capacity when people are on vacation or holidays
-to wait for the IP iteration to fix defects: - to plan work for the IP iteration during PI planning
-to wait for the IP iteration to fix defects
2. What is the purpose of the plan-do-check-adjust cycle?
- To provide regular, predictable dev cadence to produce an increment of value
- To give the ART members a process tool to keep the train on the tracks
- To create a continuous flow of work to support the delivery pipeline
- To allow the team to perform some final backlog refinement for upcoming
iteration planning: - To provide regular, predictable dev cadence to produce an increment of value
3. Which meeting should the Scrum Master attend (not facilitate)?
- Iteration Review
- Scrum of Scrums
- Daily Stand-Up
- PO sync: - Scrum of Scrums
4. Scrum masters help remove impediments, foster an environment for
high-performing team dynamics and what else?
- Relentlessly improve
- Continuously deliver
- Form and re-form teams
- Estimate stories: - Relentlessly improve
5. Each PI planning meeting evolves over time, and ending PI planning with a
Retrospective will help to do what?
- Fine tune the Economic Framework
- Meet compliance more rapidly
1/9
, SAFe Scrum Master Practice Test
Study online at https://quizlet.com/_huj2fu
- Lengthen the Architectural Runway
- Continuously improve: - Continuously improve
6. What is one truth about teams?
- Development teams can manage daily interruptions
- Products are more robust when individuals on teams have specific skill sets
- Changes in team composition do not impact productivity
- Teams are more productive than the same number of individuals: - Teams are more
productive than the same number of individuals
7. Which type of enabler does a System Architect review during a System Demo?
- Enabler Capabilities
- Enabler Features
- '' Stories
- '' Portfolio Epics: - Enabler stories
8. Who can change the backlog during an iteration?
- Agile Team
- Scrum master
- Release Train Engineer
- Senior Management: - Agile Team
9. Which statement is true about scrum?
- It is a software technical practice
- It is an ideal method for static design requirements
- it is based on empirical process control theory
- it is a Lean system Engineering technique: - it is a Lean system Engineering technique ??
10. What are two common PI planning anti-patterns?
- Too much time spent analyzing each story
- Too much time spent prioritizing features
- Team decides which changes need to happen and when
- Part-time scrum masters do not have time to plan as part of the team
2/9
Study online at https://quizlet.com/_huj2fu
1. what is an anti-pattern for the IP iteration?
- to plan work for the IP iteration during PI planning
- to allow for sufficient capacity in the program roadmap
- to ensure all stories and teams' PI plans are completed prior to the IP iteration
- to minimize lost capacity when people are on vacation or holidays
-to wait for the IP iteration to fix defects: - to plan work for the IP iteration during PI planning
-to wait for the IP iteration to fix defects
2. What is the purpose of the plan-do-check-adjust cycle?
- To provide regular, predictable dev cadence to produce an increment of value
- To give the ART members a process tool to keep the train on the tracks
- To create a continuous flow of work to support the delivery pipeline
- To allow the team to perform some final backlog refinement for upcoming
iteration planning: - To provide regular, predictable dev cadence to produce an increment of value
3. Which meeting should the Scrum Master attend (not facilitate)?
- Iteration Review
- Scrum of Scrums
- Daily Stand-Up
- PO sync: - Scrum of Scrums
4. Scrum masters help remove impediments, foster an environment for
high-performing team dynamics and what else?
- Relentlessly improve
- Continuously deliver
- Form and re-form teams
- Estimate stories: - Relentlessly improve
5. Each PI planning meeting evolves over time, and ending PI planning with a
Retrospective will help to do what?
- Fine tune the Economic Framework
- Meet compliance more rapidly
1/9
, SAFe Scrum Master Practice Test
Study online at https://quizlet.com/_huj2fu
- Lengthen the Architectural Runway
- Continuously improve: - Continuously improve
6. What is one truth about teams?
- Development teams can manage daily interruptions
- Products are more robust when individuals on teams have specific skill sets
- Changes in team composition do not impact productivity
- Teams are more productive than the same number of individuals: - Teams are more
productive than the same number of individuals
7. Which type of enabler does a System Architect review during a System Demo?
- Enabler Capabilities
- Enabler Features
- '' Stories
- '' Portfolio Epics: - Enabler stories
8. Who can change the backlog during an iteration?
- Agile Team
- Scrum master
- Release Train Engineer
- Senior Management: - Agile Team
9. Which statement is true about scrum?
- It is a software technical practice
- It is an ideal method for static design requirements
- it is based on empirical process control theory
- it is a Lean system Engineering technique: - it is a Lean system Engineering technique ??
10. What are two common PI planning anti-patterns?
- Too much time spent analyzing each story
- Too much time spent prioritizing features
- Team decides which changes need to happen and when
- Part-time scrum masters do not have time to plan as part of the team
2/9