100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CIV3701 Assignment 2 Complete Answers Study Guide 2025/2026 || Verified Solutions and Correct Explanations

Rating
-
Sold
-
Pages
21
Grade
A+
Uploaded on
02-10-2025
Written in
2025/2026

CIV3701 Assignment 2 Complete Answers Study Guide 2025/2026 || Verified Solutions and Correct Explanations Description: Updated CIV3701 Assignment 2 study resource for 2025/2026. Provides complete answers and verified explanations for civil engineering and construction management concepts. Keywords: CIV3701 assignment 2 study guide civil engineering exam prep CIV3701 verified answers construction management solutions CIV complete answers

Show more Read less
Institution
CIV3701
Course
CIV3701










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CIV3701
Course
CIV3701

Document information

Uploaded on
October 2, 2025
Number of pages
21
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CIV3701 Assignment 2 Complete Answers Study Guide 2025/2026 || Verified

Solutions and Correct Explanations

Description:

Updated CIV3701 Assignment 2 study resource for 2025/2026. Provides complete

answers and verified explanations for civil engineering and construction

management concepts.

Keywords:

CIV3701 assignment 2 study guide

civil engineering exam prep

CIV3701 verified answers

construction management solutions

CIV3701 2025 complete answers




CIV3701 Assignment 2: 100 Q&A Study Guide (2025/2026)

Section 1: Contract Law & Administration (Q1-25)

1. What is the primary purpose of a contract in construction?

A: To create a legally binding agreement that defines the rights, obligations, and

responsibilities of all parties (e.g., Client and Contractor), providing a framework

for project execution and dispute resolution.

,2. What are the three essential elements for a valid contract?

A: Offer, Acceptance, and Consideration.

3. What is the difference between an Express and an Implied term in a

contract?

A: An Express term is explicitly stated (orally or in writing), while an Implied term

is not stated but is read into the contract by law, custom, or the parties' conduct to

give it business efficacy.

4. What is the role of the Engineering and Construction Contract (NEC)'s

"Early Warning" procedure?

A: To proactively identify and manage potential problems and cost impacts early,

fostering collaboration and reducing the likelihood of disputes.

5. Define "Liquidated Damages" (LDs).

A: A pre-agreed, genuine estimate of the loss the client will suffer per day/week if

the contractor fails to complete the project by the stipulated completion date. It is

not a penalty.

6. What is a "Variation" (or Change Order)?

A: A change to the original scope of work, which may include alterations to the

design, quality, quantity, or working conditions, typically instructed by the

Engineer or Client's Representative.

, 7. What is the principle of "Quantum Meruit"?

A: A Latin term meaning "as much as he deserved." It is a claim for a reasonable

sum for work done where no fixed price was agreed upon, often used when a

contract is void or discharged.

8. What is the key difference between a "Condition" and a "Warranty" in

contract law?

A: A Condition is a major term, the breach of which allows the innocent party to

terminate the contract and claim damages. A Warranty is a minor term, the breach

of which only gives rise to a claim for damages.

9. What is "Consideration" in a contractual context?

A: Something of value (e.g., money, a promise, an act) given by one party to

another in exchange for a promise. It is the price for which the promise is bought.

10. What does "Privity of Contract" mean?

A: The doctrine that a contract cannot confer rights or impose obligations on any

person except the parties to the contract.

11. What is a "Bond" in construction, and name one common type.

A: A guarantee provided by a third party (e.g., a bank or insurance company) to

cover a contractor's failure to perform. A common type is a Performance Bond.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BRAVOSTUVIA Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
20
Member since
8 months
Number of followers
1
Documents
1672
Last sold
11 hours ago
TOP GRADE

Assignments, Case Studies, Research, Essay writing service, Questions and Answers, Discussions etc. for students who want to see results twice as fast. I have done papers of various topics and complexities. I am punctual and always submit work on-deadline. I write engaging and informative content on all subjects. Send me your research papers, case studies, psychology papers, etc, and I’ll do them to the best of my abilities. Writing is my passion when it comes to academic work. I’ve got a good sense of structure and enjoy finding interesting ways to deliver information in any given paper. I love impressing clients with my work, and I am very punctual about deadlines. Send me your assignment and I’ll take it to the next level. I strive for my content to be of the highest quality. Your wishes come first— send me your requirements and I’ll make a piece of work with fresh ideas, consistent structure, and following the academic formatting rules. For every student you refer to me with an order that is completed and paid transparently, I will do one assignment for you, free of charge!!!!!!!!!!!!

Read more Read less
4.4

5 reviews

5
3
4
1
3
1
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions