This document
a mock exam, covers several areas including verification documents,
inspection responsibilities, and likely other topics related to the field
of study. It uses a multi-section format to test knowledge on these
specific areas. The exam simulates the structure of a real exam,
providing practice and preparation for a more formal assessment.
, lOMoARcPSD| 47061011
**State the purpose of initial verification (2 marks)**
- The purpose of initial verification is to confirm that a new electrical
installation or an alteration/addition complies with the requirements of BS
7671.
- It ensures that the installation is safe to use and free from defects
before being put into service.
---
**State the purpose of periodic inspection and testing (2 marks)** - The
purpose is to assess the continued safety and condition of an existing
installation.
- It checks for any deterioration, defects, or changes that may affect
electrical safety over time.
---
**When would a Minor Electrical Installation Works Certificate be issued?
(2 marks)**
- It is issued for minor works that do not include the installation of a new
circuit, such as adding a socket to an existing circuit or replacing a
light fitting.
- The certificate is used where the work does not extend to a full
new installation or significant alteration.
---