100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

CHAPTER 16 ISDS 3115 EXAM QUESTIONS WITH 100% CORRECT ANSWERS | LATEST VERSION 2025/2026.

Rating
-
Sold
-
Pages
14
Grade
A+
Uploaded on
17-09-2025
Written in
2025/2026

What does TPS stand for? a. Total Production Streamlining b. Toyota Production System c. Taguchi's Production S's d. Total Process Simplification e. None of the above - ANS B Which of the following is generally found in most JIT environments? a. a push or pull system, depending upon the rate of demand b. a push system for high margin items and a pull system for low margin items c. a push system for purchased parts and a pull system for manufactured parts d. push systems e. pull systems - ANS E Which one of the following is not a benefit of the implementation of JIT? a. cost reduction b. variability increase c. rapid throughput d. quality improvement 2 | Page @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED e. rework reduction - ANS B Which of the following is not a reason for variability? a. Employees, machines, and suppliers produce units late. b. Customer demand is unknown. c. Employees, machines, and suppliers produce units that conform to standards. d. Engineering drawings are inaccurate. e. Drawings or specifications are incomplete. - ANS C Which of the following is specifically characterized by a focus on continuous improvement, respect for people, and standard work practices? a. Just-in-time (JIT) b. Toyota Production System (TPS) c. Lean operations d. Material requirements planning (MRP) e. kanban - ANS B Which of the following is specifically characterized by continuous and forced problem solving via a focus on throughput and reduced inventory? a. Just-in-time (JIT) b. Toyota Production System (TPS) c. Lean operations d. Material requirements planning (MRP) e. kanban - ANS A Which of the following statements regarding a pull system is true? a. Large lots are pulled from upstream stations. b. Work is pulled to the downstream stations before it is actually needed. c. Manufacturing c

Show more Read less
Institution
ISDS 3115
Course
ISDS 3115









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ISDS 3115
Course
ISDS 3115

Document information

Uploaded on
September 17, 2025
Number of pages
14
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CHAPTER 16 ISDS 3115 EXAM
QUESTIONS WITH 100% CORRECT
ANSWERS | LATEST VERSION 2025/2026.




What does TPS stand for?
a. Total Production Streamlining
b. Toyota Production System
c. Taguchi's Production S's
d. Total Process Simplification

e. None of the above - ANS B


Which of the following is generally found in most JIT environments?
a. a push or pull system, depending upon the rate of demand
b. a push system for high margin items and a pull system for low margin items
c. a push system for purchased parts and a pull system for manufactured parts
d. push systems

e. pull systems - ANS E


Which one of the following is not a benefit of the implementation of JIT?
a. cost reduction
b. variability increase
c. rapid throughput
d. quality improvement
1 | Page @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED

, e. rework reduction - ANS B


Which of the following is not a reason for variability?
a. Employees, machines, and suppliers produce units late.
b. Customer demand is unknown.
c. Employees, machines, and suppliers produce units that conform to standards.
d. Engineering drawings are inaccurate.

e. Drawings or specifications are incomplete. - ANS C


Which of the following is specifically characterized by a focus on continuous improvement,
respect for people, and standard work practices?
a. Just-in-time (JIT)
b. Toyota Production System (TPS)
c. Lean operations
d. Material requirements planning (MRP)

e. kanban - ANS B


Which of the following is specifically characterized by continuous and forced problem solving
via a focus on throughput and reduced inventory?
a. Just-in-time (JIT)
b. Toyota Production System (TPS)
c. Lean operations
d. Material requirements planning (MRP)

e. kanban - ANS A


Which of the following statements regarding a pull system is true?
a. Large lots are pulled from upstream stations.
b. Work is pulled to the downstream stations before it is actually needed.
c. Manufacturing cycle time is increased.

2 | Page @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brightstars Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
197
Member since
1 year
Number of followers
7
Documents
12560
Last sold
3 days ago
VERIFIED EXAMS AND STUDY GUIDES.

Here, you will find Study Notes, Exam answer packs 100% Guarenteed success.

3.3

31 reviews

5
10
4
4
3
8
2
3
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions