100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

PJM Generation Test Question and answers verified to pass 2025/2026

Rating
-
Sold
-
Pages
15
Grade
A+
Uploaded on
16-09-2025
Written in
2025/2026

PJM Generation Test Question and answers verified to pass 2025/2026 Real time transmission constraints or contingencies may be alleviated with generators operating A. below 60 Hz B. on a new price curve C. on a new cost curve D. off cost (out of merit) - correct answer D. off cost (out of merit) What is the minimum size for a solar park to be required to have real and reactive power telemetry ? A. 1 MW B. 3 MW C. 5 MW D. 7 MW - correct answer B. 3 MW PJM calls for which of the f

Show more Read less
Institution
PJM Generation
Course
PJM Generation









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PJM Generation
Course
PJM Generation

Document information

Uploaded on
September 16, 2025
Number of pages
15
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

PJM Generation Test Question and
answers verified to pass 2025/2026
Real time transmission constraints or contingencies may be alleviated with
generators operating


A. below 60 Hz
B. on a new price curve
C. on a new cost curve
D. off cost (out of merit) - correct answer ✔D. off cost (out of merit)


What is the minimum size for a solar park to be required to have real and
reactive power telemetry ?


A. 1 MW
B. 3 MW
C. 5 MW
D. 7 MW - correct answer ✔B. 3 MW


PJM calls for which of the following to recover the ACE so that tie line
schedules are maintained ?


A. instantaneous reserve check
B. synchronized reserves
C. supplemental status report
D. minimum generation calculation - correct answer ✔B. synchronized
reserves

, If not cancelled by PJM , the minimum generation alert expires


A. at the end of the specified light load period
B. when notified by NERC
C. 12 hours after the alert was issued
D. after a 24hour period - correct answer ✔A. at the end of the specified light
load period


When PJM declares a hot weather alert , the generation dispatcher should


A. determine if maintenance can be deferred
B. notify transmission operators
C. direct all generating stations to increase MW output
D. direct all generating stations to reduce MVAR output . - correct answer
✔A. determine if maintenance can be deferred


During system restoration , the two categories of reserves are


A. dynamic and secondary
B. spinning and quick start
C. dynamic and spinning
D. spinning and primary - correct answer ✔C. dynamic and spinning


During system restoration , frequency should be maintained between


A. 59.50 and 60.00 Hz

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Academia199 Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
347
Member since
3 year
Number of followers
208
Documents
18842
Last sold
3 days ago

3.9

50 reviews

5
27
4
6
3
7
2
3
1
7

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions