1. nnThe nnmethod nnof nncomputation nnof nnContractor's nnoverhead nnand nnprofits nnfor
nnChange nnOrder nn
nn
prices, nnwhere nnboth nnadditions nnand nndeletions nnare nninvolved, nnis
nnfound nnin nnthe:
nn
a)
nnAgreement.
nn
b) nnConditions nnof nnthe
nnContract.
nn
c) nnDivision
nn01.
nn
d) nnInstructions nnto nnBidders. nn- nnCORRECT nnANSWER-b) nnConditions nnof nnthe
nnContract.
nn
nn
2. nnGeneral nnRequirements nnare
nnpart nnof:
nn
a) nnSupplementary
nnConditions.
nn
b) nnBidding
nnRequirements.
nn
c)
nnSpecifications.
d) nnSummary nnof nnWork. nn- nnCORRECT nn ANSWER-c)
nnSpecifications.
nn
3. nnThe nnthree nnessential nnconsiderations nnin nnthe nnevaluation nnof nna nnproduct nnare: nn
a) Requirements, nnCriteria, nnand nnTests. nn
b) Costs, nnMaintenance, nnand nnInstallation. nn
c) Life nnCycle nnCost, nnInstallation nnCost, nnand nnMaintenance nnCost. nn
d) Case nnstudies, nnFailures, nnand nnProblems. nn- nnCORRECT nnANSWER-a)
nnRequirements, nnCriteria, nnand nnTests. nn
nn
nn
4. nnWhose nnresponsibility nnis nnit nnto nnfurnish nnthe nnShop
nnDrawings?
nn
a) nnThe
nnArchitect/Engineer
, nn
b) nnThe
nnContractor
nn
c) nnThe
nnOwner
d) nnThe nnSubcontractor nn - nn CORRECT nn ANSWER-b) nn The
nnContractor
nn
5. nnThe nndivision nnof nnthe nnWork nnamong nnmultiple nnprime nnContracts nnis
nndescribed nnin:
nn
a) nnInstructions nnto
nnBidders.
nn
b) nnSupplementary
nnConditions.
nn
c) nnDivision
nn01.
nn
d) nnSpecial nnConditions. nn- nnCORRECT nnANSWER-c)
nnDivision nn01.
nn
6. nnDuring nnthe nnProject nnConception nnStage, nnthe nnA/E nnmay nnbe nnretained nnto: nn
a) Develop nnoutline nnspecifications nn
b) Describe nnthe nncharacter nnof nnthe nnmechanical nnsystem nn
c) Prepare nnrenderings nn
d) Assist nnin nnfinancial nnfeasibility nnstudies nn- nnCORRECT nnANSWER-d) nnAssist nnin
nnfinancial nnfeasibility nnstudies nn
nn
7. nnWhat nnis nnthe nnmain nnpurpose nnof nnMasterFormat? nn
a) for nnscheduling, nnvalue nnmanagement, nnrecording nnof nndesign nndata nnand nnmanaging
nncosts. nn
b) used nnduring nnthe nnplanning nnstage nnof nna nnproject. nn
c) to nnorganize nnthe nnProject nnManual, nnreference nnkeynotes nnand nndetailed nncost
nnestimates. nn
d) when nnthere nnis nna nnstandardized nnneed nnfor nninformation nnto nnappear nnupon nneach
nnpage nnof nna nnproject nnmanual. nn- nnCORRECT nnANSWER-c) nnto nnorganize nnthe
nnProject nnManual, nnreference nnkeynotes nnand nndetailed nncost nnestimates. nn
nn
8. nnThe nnperson nnwho nnbecomes nnsecondarily nnliable nnfor nnanother's nndebt nnor
nnperformance nnis nncalled nnthe: nn
a) Guarantee nn
b) Warrantor nn
c) Guarantor nn
d) Warrantee nn- nnCORRECT nnANSWER-c) nnGuarantor nn
nn
9. nnIntegrated nnprojects nnare nndistinguished nnby nnall nnof nnthe nnfollowing nncharacteristics
nnexcept: nn
, a) Development nnof nnvirtual nnproject nnmodel nnthrough nninput nnfrom nna nncollaborative
nnteam nn
b) Trust-based nncollaboration nnbetween nnproject nnteam nnmembers nn
c) Maximized nnefficiency nnthrough nndesign, nnfabrication, nnand nnconstruction nn
d) "Just nnas nnneeded" nnteam nninvolvement nnto nnreduce nnowner's nnpre-construction
nnexpenses nn- nnCORRECT nnANSWER-d) nn"Just nnas nnneeded" nnteam nninvolvement nnto
nnreduce nnowner's nnpreconstruction nnexpenses nn
nn
nn
10. nnOutline nnSpecifications nnare nnwritten
nnfor
nn
a) nnonly nnDivisions nn02-14 nnwhere nnactual nnproducts nnare
nndiscussed
nn
nn
b) nnDivisions nn01-
49
c) nnonly nnDivisions nn01-14 nn(excluding nnmechanical nnand
nnelectrical)
d) nnthe nnexclusive nnuse nnof nnthe nnA/E nn- nnCORRECT nnANSWER-b)
nnDivisions nn01-49
nn
11. nnAn nnexample nnof nna nnMasterFormat nnLevel nn3 nnspecification nnSection nnis: nn
a) 05 nn00 nn00 nnMetals. nn
b) 05 nn20 nn00 nnMetal nnJoists. nn
c) 05 nn21 nn00 nnSteel nnJoist nnFraming. nn
d) 05 nn21 nn19 nnOpen nnWeb nnSteel nnJoist nnFraming. nn- nnCORRECT nnANSWER-d) nn05 nn21
nn19 nnOpen nnWeb nnSteel nnJoist nnFraming. nn
nn
12. nnWhat nnactivities nntake nnplace nnin nnthe nnProject nnConception nnStage? nn
a) The nnengineers nndevelop nnthe nnmechanical nnand nnelectrical nnsystems. nn
b) The nnsite nnis nnselected nnand nnthe nndemolition nnis nndone. nn
c) Feasibility nnstudies nnand nnbudget nnis nnset. nn
d) The nnprogram nnis nnevaluated nnand nnthe nnengineers nnare nnselected. nn- nnCORRECT
nnANSWER-c) nnFeasibility nnstudies nnand nnbudget nnis nnset. nn
nn
13. nnThe nndocument nnrecommended nnto nnorganize nnpreliminary nn construction
nninformation nninto nna nn
nn
standard nnorder nnon nnthe nnbasis nnof nnsystems nnand
nnassemblies nnis:
nn
a)
nnMasterFormat
nn
b)
nnUniformat
nn
c) nnOutline
nnSpecifications
d) nnProject nnManual nn- nnCORRECT nnANSWER-b)
nnUniformat