Which of the following is a step of the Department of Defense (DoD) Risk
Management Process? - (ANSWER)-Registration
-Sourcing
-*Mitigation*
-Tracking
Which of the following is a critical success factor to ensure effective risk
management (RM)? - (ANSWER)-Researching best practices
-Assembling the most qualified personnel for the team
-Establishing priority risk categories
-*Program Risk Process (PRP) Document*
The following describes which type of category of risk: Certification for a new
weapons system is scheduled for January. To conduct a meaningful test,
temperatures must be below freezing. If the temperature is too warm, the test
cannot be conducted. - (ANSWER)-Technical
-*Business*
-Programmatic
, Which of the following are the components of opportunity management (OM)? -
(ANSWER)-Probability, cost, future root cause
-Likelihood, level, consequence
-Level, priority, benefit
-*Future root cause, probability, benefit*
Within a program, which of the following entities is responsible for ensuring the
risk management (RM) process is executed according to the Program Risk Process
(PRP) Document? - (ANSWER)-Risk Owner
-Risk Working Group
-*Risk Management Board (RMB)*
-Program Executive Officer (PEO)
During the Materiel Solution Analysis (MSA) phase, it is important to assess risks
to achieve exit criteria for which review? - (ANSWER)-*Alternative System Review
(ASR)*
-System Functional Review (SFR)
-Preliminary Design Review (PDR)
-System Requirements Review (SRR)
Monte Carlo simulations use computational algorithms to simulate the behavior
of various systems in a nondeterministic manner. Why are these
"nondeterministic" results important to program schedule analysis? - (ANSWER)-
Because the results show the average length of the tasks needed to complete the
program for the PM to use when building the schedule
comprehensive questions and verified detailed
solutions (MULTIPLE CHOICES) |complete solutions
|A+ GRADED |100% CORRECT!!
Which of the following is a step of the Department of Defense (DoD) Risk
Management Process? - (ANSWER)-Registration
-Sourcing
-*Mitigation*
-Tracking
Which of the following is a critical success factor to ensure effective risk
management (RM)? - (ANSWER)-Researching best practices
-Assembling the most qualified personnel for the team
-Establishing priority risk categories
-*Program Risk Process (PRP) Document*
The following describes which type of category of risk: Certification for a new
weapons system is scheduled for January. To conduct a meaningful test,
temperatures must be below freezing. If the temperature is too warm, the test
cannot be conducted. - (ANSWER)-Technical
-*Business*
-Programmatic
, Which of the following are the components of opportunity management (OM)? -
(ANSWER)-Probability, cost, future root cause
-Likelihood, level, consequence
-Level, priority, benefit
-*Future root cause, probability, benefit*
Within a program, which of the following entities is responsible for ensuring the
risk management (RM) process is executed according to the Program Risk Process
(PRP) Document? - (ANSWER)-Risk Owner
-Risk Working Group
-*Risk Management Board (RMB)*
-Program Executive Officer (PEO)
During the Materiel Solution Analysis (MSA) phase, it is important to assess risks
to achieve exit criteria for which review? - (ANSWER)-*Alternative System Review
(ASR)*
-System Functional Review (SFR)
-Preliminary Design Review (PDR)
-System Requirements Review (SRR)
Monte Carlo simulations use computational algorithms to simulate the behavior
of various systems in a nondeterministic manner. Why are these
"nondeterministic" results important to program schedule analysis? - (ANSWER)-
Because the results show the average length of the tasks needed to complete the
program for the PM to use when building the schedule