Certified Construction Manager Certification Exam Questions with correct Answers 2025/2026 ( A+ GRADED 100% VERIFIED).

Rating
-
Sold
-
Pages
11
Grade
A+
Uploaded on
31-08-2025
Written in
2025/2026

Certified Construction Manager Certification Exam Questions with correct Answers 2025/2026 ( A+ GRADED 100% VERIFIED).

Institution
Certified Construction Manager Certification
Course
Certified Construction Manager Certification

Content preview

Certified Construction Manager
Certification Exam Questions with
correct Answers 2025/2026 ( A+
GRADED 100% VERIFIED).
Based on the guide quantity of 100 CY on a bid document for rock excavation, a
contractor bid a unit price of $20/CY. If the owner's representative determined that
the contractor excavated 85 CY of rock during construction, how much will the
contractor get paid?
(a). $2000
(b). $1700
(c). $300
(d). $1800 - The correct Answer is: (b)

Based on the guide quantity of 120 CY on a bid document for rock excavation, a
contractor bid a unit price of $50/CY. If the owner's representative determined that
the contractor excavated 70 CY of rock during the construction, how much will the
contractor get paid?
(a) $2000
(b). $1700
(c). $3500
(d). $6000 - The correct Answer is: (c)

Choose the correct attributes of a partnership
(a) Risk is divided between the partners equally
(b) Profits and control is divided among general partners based on degree of
ownership
(c) There is no limit on liability for partners
(d) Limited partners can increase assets of the company although they have no
voice in management
(e) Signature of all partners is necessary for a binding contract
(f) Death of a partner ends the partnership unless there are clauses in the charter
that makes arrangements for this situation - The correct Answer is: (b), (c), (d), (f)

Clauses of General Conditions documents published by organizations like AIA and
EJCDC can be modified by the owner for a specific project using -----------. - The
correct Answer is: Special conditions documents

, Conceptual cost estimates can be established using historical cost data without
significant information on the final design of a project.
T or F - The correct Answer is: T

Depreciation of an equipment decreases the tax of a corporation as much as a tax
credit equal to the depreciation.
T or F - The correct Answer is: F

Design error or omissions cannot be used as a basis for change orders even if
corrections increase the cost of construction.
T or F - The correct Answer is: F

General conditions clauses that deal with compensation of the owner for damages
due to late completion of the project are called ----------- clauses. - The correct
Answer is: Liquidated Damages

General conditions contain generic information on subjects like bonds and insurance,
contractor's responsibilities, changes in the work, and others.
T or F - The correct Answer is: True

Generic articles of the selected general conditions document can be changed using
the [A] conditions document. - The correct Answer is: supplementary/special

If a company posts a Net Operating Loss (NOL) in a given year, they are allowed to
get back some or all of the taxes they paid in the last three years which is called
carrying the loss back.
T or F - The correct Answer is: T

If a subcontractor or vendor doesn't get paid during the project, he/she may file a [A]
against the property. - The correct Answer is: lien

If the contractor gets bankrupt during the construction, the owner may use the [A]
bond to complete the work. - The correct Answer is: performance

If the contractor goes bankrupt during the construction, the owner may use the funds
from a ------------ bond to complete the work. - The correct Answer is: Performance

If the guide quantities on the proposal are suspected to be lower than actual
quantities, the contractor may submit higher unit prices to increase his profit.
T or F - The correct Answer is: F

If the owner agrees to make a mobilization payment at the beginning of the project,
the contractor will
(a) decrease the bid price because he/she won't pay for mobilization

Written for

Institution
Certified Construction Manager Certification
Course
Certified Construction Manager Certification

Document information

Uploaded on
August 31, 2025
Number of pages
11
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$10.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
gradepapers465 Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
12
Member since
11 months
Number of followers
0
Documents
1082
Last sold
2 weeks ago

3.0

1 reviews

5
0
4
0
3
1
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions