Army Explosives Safety Site Planning Certification
Exam (Actual Exam 2025) | Complete Questions and
Correct Answers | Latest Exam | Brand New Version!
USATCES has submitted your ESSP for final approval. Who did they submit to? -
(ANSWER)DDESB
What is the minimum distance permitted between an A&E location and the
installation headquarters building? - (ANSWER)Inhabited Building Distance (IBD)
What is the minimum distance permitted between a PES and an interstate
highway? - (ANSWER)Public Traffic Route Distance (PTRD)
What is the minimum distance permitted between any two operating buildings
and sites within an operating line? - (ANSWER)Intraline Distance (ILD)
What is the minimum distance permitted between an earth-covered magazine
and a nearby above-ground magazine? - (ANSWER)Intermagazine Distance (IMD)
What do you call the collection of documents that identifies the relationship
between a PES and any facilities or personnel who may be exposed to the PES? -
(ANSWER)ESSP
Your installation is putting a new roof on an existing PES facility. Do you need to
complete an ESSP? - (ANSWER)No, this type of change does not require one
, Your installation is changing the NEW of an existing facility and will be storing a
hazard division not previously approved in it. Do you need to complete an ESSP? -
(ANSWER)Yes, and it must be approved by the DDESB
Which of the following is a phase of the ESSP process? - (ANSWER)Development
and Evaluation
How many ESSP categories are there? - (ANSWER)Five
how must the ESSP package be submitted? - (ANSWER)Electronically
Which three items are in the Maps and Drawings section of an ESSP package? -
(ANSWER)Facilities maps
Installation maps
Site maps
Which three items are included in the Evaluations section of an ESSP package? -
(ANSWER)Electrical installation
Lightning protection information
Glass hazard risk assessment
What part of the ESSP package contains background information, site location,
and reason for the ESSP? - (ANSWER)ESSP narrative
Exam (Actual Exam 2025) | Complete Questions and
Correct Answers | Latest Exam | Brand New Version!
USATCES has submitted your ESSP for final approval. Who did they submit to? -
(ANSWER)DDESB
What is the minimum distance permitted between an A&E location and the
installation headquarters building? - (ANSWER)Inhabited Building Distance (IBD)
What is the minimum distance permitted between a PES and an interstate
highway? - (ANSWER)Public Traffic Route Distance (PTRD)
What is the minimum distance permitted between any two operating buildings
and sites within an operating line? - (ANSWER)Intraline Distance (ILD)
What is the minimum distance permitted between an earth-covered magazine
and a nearby above-ground magazine? - (ANSWER)Intermagazine Distance (IMD)
What do you call the collection of documents that identifies the relationship
between a PES and any facilities or personnel who may be exposed to the PES? -
(ANSWER)ESSP
Your installation is putting a new roof on an existing PES facility. Do you need to
complete an ESSP? - (ANSWER)No, this type of change does not require one
, Your installation is changing the NEW of an existing facility and will be storing a
hazard division not previously approved in it. Do you need to complete an ESSP? -
(ANSWER)Yes, and it must be approved by the DDESB
Which of the following is a phase of the ESSP process? - (ANSWER)Development
and Evaluation
How many ESSP categories are there? - (ANSWER)Five
how must the ESSP package be submitted? - (ANSWER)Electronically
Which three items are in the Maps and Drawings section of an ESSP package? -
(ANSWER)Facilities maps
Installation maps
Site maps
Which three items are included in the Evaluations section of an ESSP package? -
(ANSWER)Electrical installation
Lightning protection information
Glass hazard risk assessment
What part of the ESSP package contains background information, site location,
and reason for the ESSP? - (ANSWER)ESSP narrative