1. Which software development methodology requires stakeholders to
provide a comprehensive list of requirements?
A. Rapid application development (RAD)
B. Extreme programming
C. Waterfall
D. Scrum
- ANSWER C
2. Which software development methodology uses early prototypes to best
align with stakeholders' expectations?
A. Rapid application development (RAD)
B. Waterfall
C. Extreme programming
D. Rational unified process (RUP)
- ANSWER A
3. Which software development methodology uses sequential gates?
A. Waterfall
B. Prototyping
, C. Rational unified process (RUP)
D. Rapid application development (RAD)
- ANSWER C
4. Which phase of the systems development life cycle (SDLC) is occurring
when an organization brings project pieces together and checks
interoperability?
A. Design
B. Testing
C. Analysis
D. Planning
- ANSWER B
5. Which phase of the systems development life cycle (SDLC) involves
programmers transforming a product into a new system?
A. Testing
B. Design
C. Development
D. Implementation
- ANSWER C
6. A project team is reviewing the project scope to ensure it maps with
stakeholder expectations.
Which gate of the rational unified process (RUP) is the team executing?
A. Elaboration
B. Inception
C. Construction
D. Transition
- ANSWER B
,7. An organization is operating an in-house developed system.
Which phase of the waterfall methodology is the organization executing?
A. Implementation
B. Maintenance
C. Analysis
D. Development
- ANSWER B
8. What should a business analyst use to depict activities of different users?
A. Workflow modeling
B. Paper prototyping
C. Storyboarding
D. Simulations
- ANSWER C
9. Which prototyping method demonstrates how a solution operates?
A. Workflow modeling
B. Simulation
C. Paper prototyping
D. Storyboarding
- ANSWER B
10.Which prototyping method is used to predict user acceptance prior to
system development?
A. Diagrams
B. Role playing
C. Workflow modeling
D. Storyboards
- ANSWER B
, 11.A company has multiple locations and employs hundreds of people.
Employees must be connected to the same network and have access to the
same servers to complete day-to-day tasks. Which computer category
would meet this company's needs?
A. Desktop computer
B. Minicomputer
C. Mainframe computer
D. Laptop
- ANSWER C
12.Which topology is part of the five most common network topologies?
A. Line
B. Moon
C. Full
D. Ring
- ANSWER D
13.What is a client-server network?
A. An operating system that runs a network, steering information between
computers and managing security and users
B. A model for applications in which the bulk of the back-end processing
takes place on a server, while the front-end processing is handled by the
clients
C. A large computer network that spans large geographic areas, such as a
state, province, or country
D. A computer network that relies on the computing power and bandwidth
of the participants in the network rather than a centralized server
- ANSWER B