Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 2 pages
Exam (elaborations)

CM 4101 EXAM 1 WITH ALL CORRECT & 100% VERIFIED ANSWERS|ALREADY GRADED A+

Document preview thumbnail
Preview 1 out of 2 pages

CM 4101 EXAM 1 WITH ALL CORRECT & 100% VERIFIED ANSWERS|ALREADY GRADED A+

Content preview

CM 4101 EXAM 1 WITH ALL CORRECT & 100%
VERIFIED ANSWERS|ALREADY GRADED A+

During which of the following process, question such as what activities should be scheduled are
typically asked and answered?
- Planning
- Scheduling
- Control ✔Correct answer-Planning

Using traditional bar charts, it is always easy to tell the logic relationships between activities. (T/F)
✔Correct answer-False

An event consumes
- resources
- time
- both
- neither ✔Correct answer-Neither resources nor time

Which of the following is correct regarding Cpm and PERT?
- the calculations in CPM are non-deterministic and those in PERT are deterministic
- the calculations in CPM are deterministic and those in PERT are non-deterministic
- the calculations in both are deterministic
- the calculations in both are non-deterministic ✔Correct answer-the calculations in CPM are
deterministic and those in PERT are non-deterministic

Assume A is a milestone of a project, which of the following statement(s) can be true?
- A may take 3 days
- A needs one mason and two helpers to finish
- A costs $2,000
- A can at least be crashed by 1 day
- None of the above ✔Correct answer-None of the above

Which of the following statement is a correct description about the diagram? (Fig 1)
- The relationship between A and B is a start A and B is a start-to-finish relationship with zero days as
lag
- Five days after A is started, B can finish
- The relationship is a typical finish-to-start relationship with five days of lag
- Five days after A finished, B would start ✔Correct answer-Five days after A is started, B can finish

An activity's scheduled early start time is at the beginning of day 10. Its duration is 5 days. Its total
float is 7 days. If the activity is actually finished at the end of day 21, then which of the following
statement(s) must be true?
- The project will be delayed because of this activity
- The status of this activity will not cause a possible delay to the entire project
- The early start time of the successors of this activity will be delayed
- None ✔Correct answer-The status of this activity will not cause a possible delay to the entire
project

Document information

Uploaded on
August 16, 2025
Number of pages
2
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Studyclub
3.6
(14)
Sold
60
Followers
1
Items
12270
Last sold
6 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions