CORRECT ANSWERS!!
The purpose of Construction Quality Management is to: Answer - Achieve the
quality established by properly developed requirements through the combined
responsibility, but separate, efforts of contractor and Government personnel
Construction Quality Management is the performance of tasks, which ensure
that design and construction is performed: Answer - According to plans and
specifications, on time, within a defined budget and a safe work environment.
Partnering relationships are based upon: Answer - Building trust and
dedication to common goals
It is the responsibility of Quality Assurance Personnel to: Answer - Periodically
verify that the contractors system of control is working effectively.
An effective contractor quality control (CQC) program will: Answer - Be an
incentive for work to be done correctly the first time resulting in earlier
completion, reduced field overhead costs, and greater profits.
The success or failure of all contractors is based upon: Answer - The ability to
control costs, finance work, estimate jobs, schedule the work, and maintain
effective quality control.
, Quality Assurance Personnel have the responsibility to: Answer - Require
contractors to maintain the quality specified in the plans and specifications.
Inspection is: Answer - The process by which ongoing and completed work is
examined
During the punch-out inspection of a project: Answer - Quality Assurance
Personnel must assure that the contractor prepares a punch-list and makes
corrections.
If there is disagreement whether the contractor's work complies with the
contract: Answer - The government makes the final determination
Characteristics that describe a definable feature of work (DFOW) include:
Answer - Cross-referenced listings to the contractors construction schedule that
may have more than one definable feature under a section of the
specifications.
The _____________________ consists of daily checks of the work to assure
continuing compliance with contract requirements. Answer - Follow-up phase
The Quality Assurance Plan: Answer - Is a government management tool
establishing staffing, training, pre-award activities, and surveillance activities.
Testing is extremely important in Construction Quality Management and is
performed by: Answer - Both the contractor and the government
If the contractor does not provide an adequate superintendent, the contract
allows the contracting officer to: Answer - Require the contractor to assume
personal supervision of the work.