100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

CRL Exam Study questions well answered passed

Rating
-
Sold
-
Pages
45
Grade
A+
Uploaded on
12-08-2025
Written in
2025/2026

CRL Exam Study questions well answered passed

Institution
CRL
Course
CRL











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CRL
Course
CRL

Document information

Uploaded on
August 12, 2025
Number of pages
45
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CRL Exam Study questions well
answered passed

5S

sort, set in order, shine, standardize, sustain




5 whys

A technique in which you repeatedly ask the question "Why?" to help peel away the layers of
symptoms that can lead to the root cause of a problem




Criticality analysis allows organizations to

Identify the most significant risks




Criticality analysis attempts to identify

The likelihood of a risk occurring

,Criteria for criticality analysis may include

Safety, Environmental, and Production consequences




The earliest asset lifecycle phase a criticality analysis may be performed is:

During the design phase




The ISO standard that includes criticality analysis is:

ISO14224




Reliability strategy development (RSD) is based on three main techniques:

RCM, PMO, FMEA




RSD relies upon two areas of competence:

1. Understanding of the differences between RCM, PMO, and FMEA. 2. Identifying when and
where each technique should be applied.

,What does RSD stand for?

reliability strategy development




There are many forms of RCM, PMO, and FMEA:

All of these derivates help perform analyses cost effectively




Which of the following statements is true regarding FMEA?



1. FMEA helps designers and engineers improve the reliability of assets and systems to produce
quality products.



2. FMEA is universally applied to all new assets during the design phase.



3. FMEA governance is defined in the ISO/TS 16949

FMEA helps designers and engineers improve the reliability of assets and systems to produce
quality products




What does FMEA stand for?

Failure Mode and Effects Analysis

, What does RCM stand for?

Reliability Centered Maintenance




What does RCA stand for?

Root cause analysis




A preventative/planned maintenance optimization process focuses on:

Evaluating each PM task and eliminating unnecessary tasks or wasteful activities




The Reliability Engineering for Maintenance process is designed to:

Pinpoint potential areas for reliability improvement




Uptime divided by Uptime + Downtime equals:

Availability

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
maxiscore Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
160
Member since
3 year
Number of followers
123
Documents
6915
Last sold
3 months ago
Exam hub

4.0

40 reviews

5
20
4
7
3
8
2
2
1
3

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions