Walmart - Stormwater Exam Questions
With Correct Answers
The |1970's |law |that |set |into |place |the |regulation |of |stormwater |is: |- |CORRECT |ANSWER✔✔-
The |Clean |Water |Act
Requirements |for |managing |stormwater |activity |on |a |construction |site |are |outlined |in |the |
following |regulation: |- |CORRECT |ANSWER✔✔-NPDES
Which |of |the |following |is |never |an |allowable |stormwater |discharge |from |a |construction |site? |- |
CORRECT |ANSWER✔✔-Discharge |from |contaminated |groundwater
The |Notice |of |termination |can |filed |when: |- |CORRECT |ANSWER✔✔-All |construction |activity, |
inside |and |outside |the |building, |is |complete |and |permanent |stabilization |verified
Relative |to |stormwater |permitting, |all |of |the |following |must |occur |before |construction |starts |
except: |- |CORRECT |ANSWER✔✔-Submit |the |notice |of |termination |(NOT)
Which |erosion |control |best |mgmt |practice |increases |water |infiltration, |dissipates |rainfall |
energy |and |slows |overland |flow |of |stormwater |- |CORRECT |ANSWER✔✔-Vegetation
Of |the |following |factors |that |influence |erosion |rates, |the |one |a |contractor |has |the |most |
control |over |is: |- |CORRECT |ANSWER✔✔-Groundcover
Temporary |stabilization |should |be |implemented |- |CORRECT |ANSWER✔✔-Immediately |on |all |
disturbed |areas |that |are |likely |to |or |will |remain |inactive |for |14-days |or |more
The |Primary |purpose |of |a |construction |exit |is |- |CORRECT |ANSWER✔✔-To |remove |sediment |
from |construction |site |vehicles |and |minimize |trackout
With Correct Answers
The |1970's |law |that |set |into |place |the |regulation |of |stormwater |is: |- |CORRECT |ANSWER✔✔-
The |Clean |Water |Act
Requirements |for |managing |stormwater |activity |on |a |construction |site |are |outlined |in |the |
following |regulation: |- |CORRECT |ANSWER✔✔-NPDES
Which |of |the |following |is |never |an |allowable |stormwater |discharge |from |a |construction |site? |- |
CORRECT |ANSWER✔✔-Discharge |from |contaminated |groundwater
The |Notice |of |termination |can |filed |when: |- |CORRECT |ANSWER✔✔-All |construction |activity, |
inside |and |outside |the |building, |is |complete |and |permanent |stabilization |verified
Relative |to |stormwater |permitting, |all |of |the |following |must |occur |before |construction |starts |
except: |- |CORRECT |ANSWER✔✔-Submit |the |notice |of |termination |(NOT)
Which |erosion |control |best |mgmt |practice |increases |water |infiltration, |dissipates |rainfall |
energy |and |slows |overland |flow |of |stormwater |- |CORRECT |ANSWER✔✔-Vegetation
Of |the |following |factors |that |influence |erosion |rates, |the |one |a |contractor |has |the |most |
control |over |is: |- |CORRECT |ANSWER✔✔-Groundcover
Temporary |stabilization |should |be |implemented |- |CORRECT |ANSWER✔✔-Immediately |on |all |
disturbed |areas |that |are |likely |to |or |will |remain |inactive |for |14-days |or |more
The |Primary |purpose |of |a |construction |exit |is |- |CORRECT |ANSWER✔✔-To |remove |sediment |
from |construction |site |vehicles |and |minimize |trackout