T/F: The solicitation and basis for award for Design-Bid-Build is both quantitative and qualitative. - ANS False T/F: Design-Bid-Build is typically Low Bid Based. - ANS True T/F: One of the factors for success of a Design-Build delivery system is to engage the construction team before 20% of the design is completed by the owner. - ANS True T/F: Proposals with 35% or more of the design in the RFP will more than likely be based on Low Bid (Price). - ANS True T/F: As long as Design-Builder meets performance requirements, the Design-Builder has some flexibility to figure out the best approach. - ANS True What existing Federal Law required any federal project exceeding $100,000 to require two bonds (Performance Bond and Labor and Material Bond)? - ANS Miller Act What are the 3 fundamental decisions an Owner must make when initiating a feasible project? - ANS Type of delivery system, type of procurement method, and type of contract format. Design-Build means ________________. - ANS One company/firm is responsible for both design and construction, construction can begin before

Show more Read less
Institution
DESIGN-BUILD
Course
DESIGN-BUILD

Content preview

DESIGN-BUILD TEST #1 EXAM 2025
QUESTIONS AND ANSWERS



T/F: The solicitation and basis for award for Design-Bid-Build is both quantitative and
qualitative. - ANS False



T/F: Design-Bid-Build is typically Low Bid Based. - ANS True


T/F: One of the factors for success of a Design-Build delivery system is to engage the
construction team before 20% of the design is completed by the owner. - ANS True


T/F: Proposals with 35% or more of the design in the RFP will more than likely be based on Low
Bid (Price). - ANS True


T/F: As long as Design-Builder meets performance requirements, the Design-Builder has some
flexibility to figure out the best approach. - ANS True


What existing Federal Law required any federal project exceeding $100,000 to require two
bonds (Performance Bond and Labor and Material Bond)? - ANS Miller Act


What are the 3 fundamental decisions an Owner must make when initiating a feasible project? -
ANS Type of delivery system, type of procurement method, and type of contract format.
1




Design-Build means ________________. - ANS One company/firm is responsible for both
Page




design and construction, construction can begin before all the designs are complete.

@COPYRIGHT FYNDLAY 2025/2026

, What is a primary reason for choosing a Design-Build delivery system? - ANS If the project
needs to be done fast, it places more risk on owner, if the owner wishes to fast track project
design and construction, if the project is complex and requires close coordination of design and
construction.


Owners who choose to use Design-Build as their project delivery method of choice should
expect all of the following outcomes except for:
a) cost guarantee during design
b) time savings
c) increased administration
d) high quality

e) cost savings - ANS c) increased administration


All of the following are forms of a Design-Build entity except:
a) Joint Venture
b) Integrated DB Firm
c) Owner Led
d) A/E Led

e) GC Led - ANS c) owner led


Design-Build project delivery will not likely be effective the following condition(s) exist:
a) The owner cannot adequately specify performance and programming requirements
b) The owner insists on absolute design control
c) The project program limits innovation and flexibility

d) All of the above - ANS d) all of the above
2
Page




Which of the following best describes the Low Bid type of procurement option?

@COPYRIGHT FYNDLAY 2025/2026

Written for

Institution
DESIGN-BUILD
Course
DESIGN-BUILD

Document information

Uploaded on
August 12, 2025
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Fyndlay Kaplan University
View profile
Follow You need to be logged in order to follow users or courses
Sold
361
Member since
1 year
Number of followers
80
Documents
18668
Last sold
1 day ago
Scholar\'s Sanctuary.

Explore a Vast Collection of Finely Made Learning Materials.

3.7

68 reviews

5
32
4
8
3
13
2
6
1
9

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions